A construction method and pavement base technology, which is applied in the direction of foundation structure engineering, sheet pile walls, buildings, etc., can solve the problems of large amount of wear and easy breakage, and achieve the effects of reducing wear, cleaning the construction environment, and avoiding dust on the road surface
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] Embodiment 1: A pile spraying machine includes a drilling machine 1 and a drilling rod 2 . The drilling rig 1 includes a vehicle body 3 at the lower end, and a bracket 4 is arranged above. The support 4 is vertically provided with a feeding hydraulic device, and the feeding hydraulic device is the first hydraulic cylinder 5 . A rotary power device 6 is fixedly connected to the first hydraulic cylinder 5 , and the rotary power device 6 includes a connecting frame 7 , a motor 8 and a limit stand 9 that is drivingly connected to the motor 8 . The limit table 9 is arranged in a ring shape, and a gear is arranged on the edge of the limit table 9 to be connected with the output gear on the transmission shaft of the motor 8 in a driving manner. The connecting frame 7 is fixed on the motor 8 and is fixedly connected with the first hydraulic cylinder 5 at the same time. The connecting frame 7 is also provided with a linkage portion 10 that interferes with the upper and lower e...
Embodiment 2
[0042] Embodiment 2: a construction method for spraying piles for pavement base, comprising the following steps:
[0043] a. The roadbed is leveled, and all obstacles are clearly surfaced;
[0044]b. Fix the drilling rig 1, adjust the fixed angle of the drilling rod 2 to ensure that the drilling rod 2 is in a vertical state, inject the mixed concrete into the drilling rod 2, and at the same time wrap the annular ring around the lower part of the drilling rod 2;
[0045] c. Start the drilling rig 1, turn on the rotary power device 6, screw the limit stand 9 into the top of the drill pipe 2, and continue to drive the drill rod 2 to rotate by the rotary power device 6, and then start the feeding hydraulic device to assist the drill rod 2 to drill down , keep the drilling speed v=0.2~0.3m / min, and the drilling depth generally does not exceed 0.5m;
[0046] d. Spray the pile. After the drill pipe 2 reaches the specified depth, stop rotating the power device 6, open the ring, start...