Method for smooth blasting excavation of large-diameter surge shaft and long-footage pilot well in soft-rock and extremely-soft-rock area

A technology of smooth blasting and surge wells, which is applied to the smooth blasting excavation method of pilot wells with large diameter surge wells in extremely soft rock areas, soft rock fields, and can solve the problems affecting the progress, cost, quality and safety of surge wells , Surrounding rock and lining concrete deformation, and lining work difficulties, etc., to improve the construction method, shorten the construction period, and achieve good results

Active Publication Date: 2017-10-17
POWERCHINA HUADONG ENG COPORATION LTD
View PDF8 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

After each blasting, the surrounding rock at the excavation boundary is easily affected by the blasting, and cracks, spalling, falling blocks, over-excavation, and even large-scale landslides occur, which will cause great difficulties in the later lining work. In addition, repeated blasting vibrations It is easy to cause deformation, cracking and collapse of the surrounding rock and lining concrete that have been lined in the upper layer
This has seriously affected the progress, cost, quality and safety of surge well excavation construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for smooth blasting excavation of large-diameter surge shaft and long-footage pilot well in soft-rock and extremely-soft-rock area
  • Method for smooth blasting excavation of large-diameter surge shaft and long-footage pilot well in soft-rock and extremely-soft-rock area
  • Method for smooth blasting excavation of large-diameter surge shaft and long-footage pilot well in soft-rock and extremely-soft-rock area

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] Embodiments of the present invention will be described in further detail below in conjunction with the accompanying drawings.

[0035] Take a surge well with a diameter of 12 meters and a depth of 20 meters as an example to implement the technical proposal of the present invention.

[0036] A smooth surface blasting excavation method of a large-diameter surge well with a length and footage of a pilot well in soft rock and extremely soft rock areas is characterized in that it includes the following steps:

[0037] (A) Long footage pilot well excavation

[0038] The pilot well is arranged in the center of the circular excavation surface, forming a concentric circle structure with the excavation surface. The excavation depth of the pilot well runs through the surge well, and the diameter of the pilot well is one-third of the diameter of the surge well;

[0039] I. Layout of blast holes for pilot wells

[0040] A central blast hole 301 is arranged at the center of the pil...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a method for smooth blasting excavation of a large-diameter surge shaft and a long-footage pilot well in a soft-rock and extremely-soft-rock area. The method comprises the steps of (A) excavation of the long-footage pilot well and (B) excavation of the surge shaft. (A) comprises the steps that I, blast holes of the pilot well are distributed; II, detonation is conducted on the pilot well; III, deslagging is conducted on the pilot well; and IV, a small step that horizontal blast holes are distributed is conducted. (B) comprises the steps that V, blast holes of a surge shaft are distributed; VI, surge hole detonation is conducted; and VII, a small step of surge shaft deslagging is conducted. Through a mode that the pilot well and the blast hole positions of the surge shaft are arranged, the detonating order is set, the hole depth, the hole diameter and the blasting strength of each blast hole is designed, the problems of peeling off, cracking and chip off-falling of a surrounding rock and a concrete lining caused by previous repeated blasting and excavation are solved, the smooth blasting effect is achieved, one-time excavation forming is achieved, and deslagging from top to bottom is achieved; and the construction mode is improved, the working efficiency is improved, the tunneling schedule is effectively guaranteed, the construction period is shortened, and further the safety of the personnel and equipment are guaranteed.

Description

technical field [0001] The invention relates to the technical field of water conservancy and hydropower engineering, in particular to a smooth-surface blasting excavation method for a large-diameter surge well with a length and footage of a pilot well in soft rock and extremely soft rock areas. Background technique [0002] In the field of water conservancy and hydropower, the surge well is a common hydraulic structure. The vertical depth of the built project can range from a dozen meters to more than 400 meters, and the diameter ranges from a few meters to tens of meters. The surge well can directly provide hydraulic power for the turbine, and its excavation quality and smooth surface effect have a great influence on the output effect of the turbine in the later stage, which is directly related to the power generation, and even related to the operating efficiency of the entire power station. [0003] The research object of the present invention is a method for excavating a ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): F42D1/00F42D3/04
CPCF42D1/00F42D3/04
Inventor 彭鹏单治钢李华
Owner POWERCHINA HUADONG ENG COPORATION LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products