A technology of cyclone separator and separation unit, which is applied in the direction of cyclone device, etc., can solve the problems of no replacement of internal separation unit, change of processing capacity, and long replacement period, so as to shorten the overall construction period, improve installation accuracy and low construction cost Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] Embodiment 1: A separation unit replacement method of a horizontal three-stage cyclone separator, comprising the following steps:
[0023] (1) Set a vertical positioning support frame 2 at the bottom of the lower shell 1 of the horizontal three-stage cyclone separator, and support and fix the old separation unit 3 along the vertical direction;
[0024] (2) Cut and separate the upper shell 4 from the external pipeline (not shown in the figure), then cut off the upper shell 4 from the lower shell 1 and the old separation unit 3, and lift the upper shell 4 away with a crane ;
[0025] (3) Use a crane to lift the old separation unit 3 from the vertical positioning support frame, and lift it out from the upper part of the lower casing 1, and then use a crane to lift the new separation unit 5 from the upper part of the lower casing 1 Hang it in, then put the bottom of the new separation unit 5 vertically on the vertical positioning support frame 2;
[0026] (4) Use a crane ...
Embodiment 2
[0029] Embodiment 2: The remaining parts are the same as Embodiment 1, the difference is that when the vertical positioning support frame 2 is set, the installation hole group is first opened on the lining 11 at the bottom of the lower casing 1, and the installation hole group is set on the installation hole group. Vertically position the supporting frame 2 to support and fix the old separation unit 3 along the vertical direction; after removing the vertically positioning supporting frame 2, restore the lining 11 arranged in the installation hole group.
Embodiment 3
[0030] Embodiment 3: The remaining parts are the same as Embodiment 1, the difference is that the vertical positioning support frame 2 includes six horizontal support beams 21, oblique support beams 22, columns 23 and reinforcement beams 24, and the installation hole group includes the number and oblique support The first installation hole 25 corresponding to the beam 22 and the second installation hole 26 corresponding to the column 23 in number, the first installation hole 25 is located on the upper part of the second installation hole 26, and the lower end of the inclined support beam 22 is supported on the first installation hole 25 Inside, the upper ends of the inclined support beams 22 are abutted and supported on the bottom cone surface of the separation unit, a plurality of inclined support beams 22 are evenly distributed around the separation unit, and the horizontal support beams 21 are fixedly arranged between two adjacent inclined support beams 22 , the bottom end o...