Cast-in-place planting concrete construction method of saline-alkali soil
A technology of greening concrete and construction methods, applied in botany equipment and methods, excavation, sea area engineering, etc., can solve the problems of non-improvement and single vegetation types, and achieve the effects of reducing transportation costs, improving the ecological environment, and reducing project costs
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2017-11-10
- Estimated Expiration
- Not applicable · inactive patent
Abstract
Description
technical field
[0001] The invention relates to the technical field of environmental protection, in particular to a construction method of cast-in-place greening concrete in saline-alkali land. Background technique
[0002] With the rapid development of my country's economy, the acceleration of urbanization and the increase of urban buildings have seriously affected the environment on which we live, and the pressure of environmental protection is increasing. Environmental problems have become a major problem hindering social progress and human development, and have received common attention from people.
[0003] With the increasing calls for environmental protection, maintaining ecological diversity, and maintaining sustainable social development, and the gradual implementation of relevant policies, all sectors of society have actively invested in ecological restoration and environmental protection, proposed many effective methods, and developed many Green building material...
Examples
Embodiment 1
[0046] The invention provides a construction method for cast-in-situ greening concrete in saline-alkali land, comprising the following steps:
[0047] 1) Weigh the following components and their mass parts: 500 parts of gravel with a particle size of 15-20 mm, 100 parts of P42.5 Portland cement, 60 parts of water, and 4 parts of special additives for greening concrete;
[0048] 2) After mixing the above-mentioned components, stir for 5 minutes to ensure that each gravel is wrapped by cement and ensure that the compressive strength is 5N / mm to obtain green concrete;
[0049] 3) After leveling the work surface to be built, lay the green concrete in step 2) on the work surface, scrape it flat, and shape it with a molding machine to form holes with a diameter of 25mm and a depth of 60-80mm on the surface, 130 per square meter ;
[0050] 4) After forming, cover with a covering for moisturizing maintenance or watering maintenance;
[0051] 5) Sprinkle the nutritious soil into the ...
Embodiment 2
[0055] The invention provides a construction method for cast-in-situ greening concrete in saline-alkali land, comprising the following steps:
[0056] 1) Weigh the following components and their mass parts: 500 parts of gravel with a particle size of 10-20 mm, 100 parts of P42.5 Portland cement, 50 parts of water, and 4 parts of special additives for greening concrete;
[0057] 2) After mixing the above-mentioned components, stir for 8 minutes to ensure that each gravel is wrapped by cement, and ensure that the compressive strength is 6N / mm, and green concrete is obtained;
[0058] 3) After leveling the work surface to be built, lay the green concrete in step 2) on the work surface, scrape it flat, and shape it with a molding machine to form holes with a diameter of 25mm and a depth of 60-80mm on the surface, 140 per square meter ;
[0059] 4) After forming, cover with a covering for moisturizing maintenance or watering maintenance;
[0060] 5) Sprinkle the nutritious soil i...
Embodiment 3
[0064] The invention provides a construction method for cast-in-situ greening concrete in saline-alkali land, comprising the following steps:
[0065] 1) Weigh the following components and their mass parts: 500 parts of gravel with a particle size of 10-15mm, 100 parts of P42.5 Portland cement, 55 parts of water, and 4 parts of special additives for greening concrete;
[0066] 2) After mixing the above-mentioned components, stir for 8 minutes to ensure that each gravel is wrapped by cement, and ensure that the compressive strength is 6N / mm, and green concrete is obtained;
[0067] 3) After leveling the work surface to be built, lay the green concrete in step 2) on the work surface, scrape it flat, and shape it with a molding machine to form holes with a diameter of 25mm and a depth of 60-80mm on the surface, 150 per square meter ;
[0068] 4) After forming, cover with a covering for moisturizing maintenance or watering maintenance;
[0069] 5) Sprinkle the nutritious soil in...