Multi-cave multi-machine water conservancy and hydropower engineering energy index calculating method

A water conservancy project and index calculation technology, applied in calculation, instrumentation, data processing applications, etc., can solve problems such as large subjective factors, difficulty in ensuring schemes, and lack of accuracy of energy indicators

Active Publication Date: 2018-05-25
POWERCHINA CHENGDU ENG
View PDF3 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0009] The purpose of the present invention is to provide a method for calculating the energy index of multi-cavity and multi-machine water conservancy projects, which solves the problem that the current processing method using fixed output coefficients cannot truly reflect the impact of differences in the energy conversion efficiency of hydraulic turbines at different times on the output and power generation of power stations. The accuracy of the index is lacking, and in the current energy inde...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Multi-cave multi-machine water conservancy and hydropower engineering energy index calculating method
  • Multi-cave multi-machine water conservancy and hydropower engineering energy index calculating method
  • Multi-cave multi-machine water conservancy and hydropower engineering energy index calculating method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0047] The method for calculating the energy index of the multi-cavity and multi-machine water conservancy project in the embodiment of the present invention includes the following steps:

[0048] Real-time collection of the average power generation net water head of the hydropower station, the distributed power generation flow, the energy conversion efficiency of the generator, the turbine runner diameter and the corresponding water turbine efficiency within the set period of time, according to the collected average power generation net water head, distributed power generation flow, The output coefficient of the hydropower station in the corresponding period is calculated from the energy conversion efficiency of the generator, the runner diameter of the turbine and the corresponding turbine efficiency;

[0049] According to the average power generation net water head collected in real time within the set period, the distributed power generation flow and the calculated output c...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to an energy index calculation technology, in particular to a multi-cave multi-machine water conservancy and hydropower engineering energy index calculating method. The method mainly solves the problems that currently, due to a processing mode with constant force coefficients, the influence of the difference of the energy conversion efficiency of a water turbine at differentmoments on the force and the power generation amount of a power station cannot be truly reflected, and the energy index accuracy is poor; moreover, due to an existing multi-cave multi-machine power station energy index calculation method, power generation diversion flow distribution among caves and machines is conducted generally with the assistance of manual experience, since a calculation targetand principle are not definite and the subject factors are large, during design of cave-machine schemes, it is difficult to ensure that energy indexes among the schemes have a consistent comparison basis, and the scheme reliability is poor. The multi-cave multi-machine water conservancy and hydropower engineering energy index calculating method is characterized in that with the maximum annual power generation amount of a hydropower station being a target energy index, a calculation model is built to calculate other energy indexes, when the multi-cave multi-machine water conservancy engineering power generation flow is optimally distributed, the annual power generation amount of the hydropower station is the largest, and the method is applicable to multi-cave multi-machine water conservancy and hydropower engineering.

Description

technical field [0001] The invention relates to the technology of multi-cavity and multi-machine hydropower and water conservancy projects, in particular to the technology of the energy index calculation method of multi-hole and multi-machine hydropower and water conservancy projects. Background technique [0002] A multi-hole multi-machine hydropower project refers to a hydropower and water conservancy project with multiple water diversion tunnels, each of which corresponds to multiple water turbines. Energy index calculation refers to the process of inflow runoff, reservoir conditions, reservoir power station operation mode, water diversion power generation conditions etc. are known, calculate the power generation output process, power generation head process, power generation and other indicators of the power station. [0003] Calculation of energy index is a very important and basic work in the investigation, design and operation management of hydropower and water conser...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/06
CPCG06Q10/06393G06Q50/06Y02E40/70Y04S10/50
Inventor 周佳柏睿李亮
Owner POWERCHINA CHENGDU ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products