Operation and maintenance management method with combination of personnel positioning with BIM

A technology for operation and maintenance and personnel positioning, applied in the fields of computer and building operation and maintenance, it can solve the problems that building information model is difficult to apply to the operation and management period, the professional quality of property management personnel is uneven, and the model reading is difficult. Achieve the effect of expanding practical functions, reducing reading difficulty, and enhancing utilization efficiency

Inactive Publication Date: 2018-06-08
THE SECOND CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU
View PDF6 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

With the development of BIM in the field of domestic construction, more and more construction units and construction units have invested more energy in building construction models, but this part of the work results - building information models are difficult to apply in the operation and management period. , resulting in a waste of early results
[0003] In my country, based on the current status quo, building information modeling is mainly used in the design and construction stages, subject to the huge size of the model and the high operating threshold, so BIM has not been widely used in the construction operation and management period. The professional quality of property management personnel is uneven, and it is difficult to read the model

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Operation and maintenance management method with combination of personnel positioning with BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments, but these embodiments should not be construed as limiting the present invention.

[0027] Such as figure 1 As shown, an operation and maintenance management method combining personnel positioning and BIM proposed by the present invention includes the following steps:

[0028] 1) Correct the BIM model in the design stage and construction stage, so that the BIM model corresponds to the actual construction site one by one, and form the BIM model in the operation and maintenance stage. Specific steps include:

[0029] 11) Construct a three-dimensional architectural model according to the architectural engineering drawings in the design stage;

[0030] 12) Modify the three-dimensional building model according to the actual situation in the construction stage to generate a construction stage model;

[0031] 13) Compare with the construction site, a...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an operation and maintenance management method with combination of personnel positioning with BIM. The method comprises: step one, modifying a BIM model at a design stage and aconstruction phase to form a BIM model at an operation and maintenance stage; step two, according to actual demands of the operation and maintenance management stage of the building, coding all components in the BIM model; step three, carrying out light-weight processing on the data of the BIM model and storing the processed data in a database, reading the database by using a third-party operation and maintenance software by invoking an interface, and displaying the BIM model in real time; step four, arranging a bluetooth sensor positioning receiver inside the building; step five, acquiring the current location of a user by holding a mobile terminal that is provided with the third-party operation and maintenance software and has the bluetooth transmission function by the user; and step six, marking the current location of the user in the displayed BIM model by the third-party operation and maintenance software, thereby carrying out continuous positioning or path navigation. Therefore,path navigation of equipment maintenance in the ceiling is realized; the work efficiency is improved; and the operation cost is lowered.

Description

technical field [0001] The invention relates to the computer technology field and the building operation and maintenance technology field, and specifically refers to an operation and maintenance management method combining personnel positioning and BIM. Background technique [0002] BIM (Building Information Modeling) is based on the relevant information data of the construction project, establishes a three-dimensional building model, and simulates the real information of the building through digital information simulation. At present, BIM has been widely developed at home and abroad. Through BIM technology, establishing a sound life cycle management system and developing an integrated information management system have become an important research direction and development trend to improve the informatization level of the construction industry. With the development of BIM in the field of domestic construction, more and more construction units and construction units have inv...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q50/08G06F17/50
CPCG06Q50/08G06F30/13
Inventor 蒋森林徐小平严旌毓张道勇许再生
Owner THE SECOND CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products