A construction method of cast-in-place piles passing through karst caves
A construction method and cast-in-place pile technology, which is applied in sheet pile walls, foundation structure engineering, construction, etc., can solve problems such as pollution and waste of materials, and achieve the effects of convenient on-site construction, convenient operation, and material saving
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] Below in conjunction with accompanying drawing, mode and implementation steps of the present invention are further described
[0034] A construction method for cast-in-situ piles passing through karst caves, which consists of three parts: drilling, filling and pouring.
[0035] ①Pile holes are divided into upper pile holes, middle pile holes and lower pile holes, corresponding to upper pile 13, middle pile 12 and lower pile 11 respectively:
[0036] The upper pile hole is divided into construction in the upper non-karst area of the karst cave and construction in the upper karst area of the karst cave, such as figure 1 As shown, conventional methods are used for construction in the upper non-karst area; figure 2 As shown in the figure, the pile hole is constructed by rotary drilling rig in the upper karst area of the cave.
[0037] The central pile hole is located in the ice layer 6 of the cave 3, such as Figure 5 As shown, the ice layer 6 in the karst cave 3 ...