Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

218results about How to "Solution conditions" patented technology

Tax-control safety two-dimensional code encoding and decoding processing method

The invention discloses a tax-control safety two-dimensional code encoding and decoding processing method. By means of the method, a tax-control safety two-dimensional code generated through the method has a plurality of levels of tax-control safety protection, anti-counterfeiting and safety performance of the tax-control safety two-dimensional code is improved, electronic signature information carried by the code can serve as a tool carrying out off-line authenticity identification on the condition of separation from the internet, the problem that when electronic bill information is transmitted through the two-dimensional code in the prior art, the authenticity identification is limited by network conditions and time is solved, and tax-control safety of the tax-control safety two-dimensional code is effectively enhanced. The tax-control safety two-dimensional code decoding processing method not only can prevent illegal leakage of useful information in the tax-control safety two-dimensional code, but also can immediately identify authenticity of the electronic bill information contained in the tax-control safety two-dimensional code off-line on the condition that the internet is not relied on, and therefore the tax-control safety of the tax-control safety two-dimensional code during the decoding process is further improved.
Owner:CHONGQING FARSIGHT PRINTING +1

Mobile ultrasonic anemoclinograph and method for measuring wind speed and direction

InactiveCN102175887ASolve the technical problems that cannot meet the wind speed and direction measurement in mobile situationsSolve the technical problem that the position data cannot be obtained accuratelyIndication/recording movementFluid speed measurementUltrasonic sensorEngineering
The invention provides a mobile ultrasonic anemoclinograph and a method for measuring wind speed and direction, wherein the device comprises an ultrasonic wind speed and direction measuring unit, a mobile system carrier speed measuring unit and a system direction measuring unit; the wind speed and direction measuring unit comprises a base, a control circuit board, six measuring arms and six ultrasonic transmitting/receiving sensors; the measuring arms are connected to the base and in an included angle at 60 degrees in turn; each measuring arm is provided with an ultrasonic sensor; the speed and direction measuring unit of the system carrier comprises a speed sensor and a direction measuring component; simultaneously, the invention further provides a method for measuring the wind speed anddirection in actual environment under a mobile condition by ultrasonic, wherein the method comprises the steps of: measuring the wind speed and direction parameters under the mobile condition by the ultrasonic wind speed and direction measuring unit; combining the measured moving speed and direction parameters of the system carrier; and calculating the measured wind speed and direction parametersin actual environment of the system under a mobile condition.
Owner:兴化市华伦达铸钢有限公司

Route device and method for raising service quality of space information network

InactiveCN101001102ATaking into account the interruption rateTaking into account the business blocking rateData switching by path configurationRadio transmissionTime delaysInformation networks
This invention relates to a route device for increasing service quality of day-base information networks including an input module, an initializing module, a negative computation module, a positive commutation module and an output module. This invention also relates to a route method including: transforming the current network to a first topological structure, transforming the link price of the first topology to generate a second topological structure according to the interruption probability of the link, computing the shortest path based on time delay from the nodes to the destination node in the second topological structure and judge if the time delay value of the shortest path from the destination node to the source node meets the restriction condition, if not, the time delay value of the shortest path from the nodes to the destination node is registered and the shortest path based on link price from the destination node to the source node is computed, judging if the time delay value of said path meets the restriction condition, if so, said path is the optimum one, otherwise, the positive computation program is called to search for the optimum path from the source node to the destination.
Owner:BEIHANG UNIV

Bending torsion test loading device for steel tube concrete pile

InactiveCN103558099ASolution conditionsSolve the two major problems of non-ideal rotation of CFST columns when torque is appliedMachine part testingStrength propertiesCircular discPull force
The invention discloses a bending torsion test loading device for a steel tube concrete pile. According to the bending torsion test loading device for the steel tube concrete pile, two problems that the bending moment condition is not ideal and simple, and the rotation of the steel tube concrete pile is not ideal when the torque is applied in a previous bending torsion test are solved. The bending torsion test loading device comprises two tension jacks, tension sensors, a connection joint, steel wire ropes, round groove discs, a fixed hinge support, a sliding hinge support, two counterforce pillars and rotation supports, wherein the rotation supports are mounted on the fixed hinge support and the sliding hinge support respectively; the two tension jacks are mounted on the outer sides of the two counterforce pillars respectively and located on different sides of the round groove discs on two ends of the steel tube concrete pile; the top ends of the tension jacks are provided with the tension sensors; the tension sensors are connected with the steel wire ropes which are wound on the round groove discs through connection joints. Due to the adoption of the bending torsion test loading device for the steel tube concrete pile, bending torsion test results of the steel tube concrete pile fit with finite element analysis results well. Meanwhile, the bending torsion test loading device for the steel tube concrete pile also has the characteristics of convenience in assembly and recyclability.
Owner:SHENYANG JIANZHU UNIVERSITY

Five-coordinate plunge milling machining method of closed type bladed disc

The invention discloses a five-coordinate plunge milling machining method of a closed type integral bladed disc, comprising the steps of: dividing machining areas of a passage of the machined closed type bladed disc; respectively generating passage offset surfaces in an air edge machining area and an air-exhaust edge machining area; solving a boundary line of the passage; generating straight-grain enveloping surfaces of the passage offset surfaces of the closed type integral bladed disc; respectively obtaining plunge milling cutter spacing orbits of the air edge machining area and the air-exhaust edge machining area so as to obtain the plunge milling cutter spacing orbits of the passage of the closed type integral bladed disc; and finally conducting plunge milling on the closed type integral bladed disc on a five-coordinate numerical control machine according to the obtained plunge milling cutter spacing orbits. The invention prevents the cutter interference when the closed type integral bladed disc is machined, solves the technical problems of great programming difficulty, multiple constraint conditions, the complex solving process of the cutter spacing orbits, and the like in the machining process and effectively realizes the five-coordinate plunge milling machining of the closed type integral bladed disc.

Method for erecting large-span lower chord variable truss high continuous steel trussed beam cantilever

The invention discloses a method for erecting a large-span lower chord variable truss high continuous steel trussed beam cantilever. Temporary buttresses are adopted in side-span steel beams to assist in semi-cantilever splicing and erection, and main-span full cantilever erection is conducted. The method specifically includes the steps that steel beam lifting stations are arranged at the positions of abutment piers, the temporary buttresses are arranged at the positions of corresponding joints of the side-span steel beams according to the main truss structure stress, the beams are lifted through the lifting stations and transported through a bridge floor, and an upper chord beam erection crane is used for erecting the steel beams joint by joint from the side span to the main span; and in the midspan closure process, the down-warping and the turning angle of the front end of a closure opening are adjusted through an abutment pier beam rising and falling method, and in combination with measures of longitudinal jacking and pulling of the steel beams and the like, the steel beams are closed with the high accuracy. By the adoption of the method for erecting the large-span variable truss high continuous steel trussed beam cantilever, the construction problem of striding over a river without a large-tonnage ship navigation condition and with a navigation requirement is solved.
Owner:STEEL STRUCTURE CONSTR CO LTD OF CHINA TIESUU CIVIL ENG GRP

Substation wireless data transmission and overhaul management system and method

PendingCN108471168ASolve the needs of layingSolving requires a lot of manpower and material resourcesCircuit arrangementsResourcesData acquisitionComputer terminal
Provided is a substation wireless data transmission and overhaul management system and method. The substation wireless data transmission and overhaul management system includes a substation data collection module, a substation data transmission module, a substation comprehensive data transmission platform, a VPDN substation data collection remote transmission network, a remote scheduling automation system server and a mobile terminal. The substation wireless data transmission and overhaul management system and method have the advantages that through a wireless technology, a traditional wired transmission mode between substation backgrounds and collection terminals is changed, the construction difficulty is reduced, and requirements for laying wires inside substations are met; besides, regarding personnel assignment, multiple elements such as the technical proficiency degrees, credit degrees, fatigue information and alcohol intake of personnel are comprehensively taken into consideration, maintenance personnel who can be most suitable for participating default maintenance are selected, and through the modes that two-dimensional codes are adopted to replace traditional work tickets and matters needing attention are played through voice, the security during substation maintenance is improved.
Owner:山东广域科技有限责任公司

Vehicle collection reservation method on basis of two-dimensional codes of mobile terminals

The invention relates to a vehicle collection reservation method on the basis of two-dimensional codes of mobile terminals. The vehicle collection reservation method includes steps that vehicle owners input identity verification codes and vehicle collection reservation time by the aid of the mobile terminals; the mobile terminals transmit vehicle collection reservation information of the vehicle owners and unique identification codes of mobile equipment to a parking lot server; an AGV (automatic guided vehicle) fetches vehicles and stores the vehicles in temporary reservation parking spaces; the parking lot server generates vehicle collection successful reservation two-dimensional codes, and the vehicle collection successful reservation two-dimensional codes are transmitted to the mobile terminals of users; the users arrive at a parking lot via the vehicle collection successful reservation two-dimensional codes and receive scanning verification; the vehicles are shifted to vehicle access chambers from the temporary reservation parking spaces; the vehicle owners fetch the vehicles from the vehicle access chambers. The vehicle collection reservation method has the advantages that the design is reasonable, vehicle collection reservation requests can be transmitted to the parking lot server via the mobile terminals, the vehicle collection successful reservation two-dimensional codes can be acquired via the mobile terminals, accordingly, verification operation can be completed only by the aid of the two-dimensional codes when the users collect the vehicles, and long-term problems of complicated vehicle collection verification means, multiple constraint conditions, high implementation cost and low efficiency can be solved.
Owner:无锡普智联科高新技术有限公司

Intelligent drainage and mining method of coalbed methane well and intelligent drainage and mining equipment of coalbed methane well immersed pump

InactiveCN101666223ASolution conditionsSolve the problem that the liquid is viscous and easy to jam the pump and burn the pumpFlexible member pumpsFluid removalWater qualityStreamflow
The invention discloses an intelligent drainage and mining method of a coalbed methane well and intelligent drainage and mining equipment of a coalbed methane well immersed pump. The intelligent drainage and mining method is realized as follows: in the pumping and sucking process, liquid the water quality of which confirms to requirements is supplied for underground liquid by a set flux when a liquid replenishing condition is met so that the height and the descent speed of an underground liquid level as well as the viscidity and the output of the underground liquid all confirms to the normal drainage and mining requirement. The drainage and mining equipment comprises a drainage and a water replenishing device; the water replenishing device consists of a water supply device and a water replenishing pipe, wherein the water supply flow of the water supply device is controlled by a control cabinet, the water replenishing pipe is connected with a water outlet of the water supply device, andthe outlet of the water replenishing pipe is arranged near an underground immersed pump. The intelligent drainage and mining method and equipment can continuously replenish, release and drain liquidaccording to the well condition, thereby solving the problems that a submergible motor is easy to burn out due to deteriorative radiating condition and the pump is easy to clamp and burn due to viscidliquid under the conditions that the liquid supply of a coalbed methane reservoir is lowered, the coal ash content of liquid is increased and the tonnage is lower; in addition, the periods for sand bailing and pump inspection are prolonged.
Owner:濮阳市鑫益实业有限公司

Explosive collision sensitivity instrument

The invention relates to an explosive performance detection device, in particular to an explosive collision sensitivity instrument, which is mainly used for solving the problems of poor testing consistence, low testing accuracy and difficulty in ensuring the testing conditions existing in the conventional collision sensitivity testing device. The explosive collision sensitivity instrument comprises a drop hammer elevating and positioning mechanism, a drop hammer fixing and releasing mechanism, a collision device mechanism, an optically-controlled anti-secondary-collision mechanism and an integral control mechanism, wherein the drop hammer elevating and positioning mechanism comprises a base, an elevating guide rail which is vertically fixed on the upper surface of the base, an upper fixed plate which is horizontally fixed at the top end of the elevating guide rail and an elevating plate of which the end part is connected with the elevating guide rail in a sliding manner; and the drop hammer fixing and releasing mechanism comprises a drop hammer, a drop hammer sucking cover and a vacuum pump connecting pipe. The explosive collision sensitivity instrument has the characteristics of Custer and 12-type tool testing structures, can be used for detecting the sensitivity properties such as collision explosion probability, characteristic drop height and the like of an explosive, and can be used for detecting the safety performance of the explosive.
Owner:ZHONGBEI UNIV

Electric field regulation and control-based two-dimensional spinning electronic device and preparation method thereof

ActiveCN108767107ARegulating polarizabilitySolve the need in a strong magnetic fieldGalvano-magnetic material selectionGalvano-magnetic device detailsElectricityAntiferromagnetic coupling
The invention discloses an electric field regulation and control-based two-dimensional spinning electronic device and a preparation method thereof, and relates to electric field regulation and controlfor generation and polarization rates of spinning currents. The device structure comprises a sandwich structure of a first BN two-dimensional material/ferromagnetic metal-doped III-VI group chalcogenide two-dimensional material/second BN two-dimensional material, a transparent electrode connected with the first BN two-dimensional material and the second BN two-dimensional material, and a channelelectrode connected with the III-VI group chalcogenide two-dimensional material; the ferromagnetic metal is doped in crystal lattice displacement position or gap position of the III-VI group chalcogenide two-dimensional material, so that the electrons of the III-VI group chalcogenide two-dimensional material are subjected to spinning polarization; the spin-polarized electrons generate a spin current through a channel loop under excitation of the incident laser, and the magnetic structure of the ferromagnetic metal-doped III-VI group chalcogenide two-dimensional material is regulated to be converted between ferromagnetic coupling and anti-ferromagnetic coupling through an externally applied perpendicular electric field, so that the polarization rate of the spin current can be regulated within the range of 0-100%, and the two-dimensional spinning electronic device with controllable polarization rate is formed.
Owner:XIAMEN UNIV

PH responsive nanometer carrier as well as preparation method and application thereof

ActiveCN109549933ASolve the technical problem of being unable to efficiently carry large biomacromolecules such as proteinsAchieve controlled releaseNervous disorderPeptide/protein ingredientsControl releaseNanoparticle
The invention discloses a pH responsive nanometer carrier as well as a preparation method and application thereof, and belongs to the field of medicine delivery. Biomacromolecule is loaded to a pore canal of pH responsive mesoporous silica nanoparticles, a hole plugging agent is used for plugging the pore canal of the mesoporous silica nanoparticles, and the pH responsive mesoporous silica nanoparticles are mesoporous silica nanoparticle surface grafted acidic sensitivity molecules, wherein the diameter of the nanoparticle pore canal is 5-50nm. Under the condition that the pH value is smallerthan or equal to threshold, an acidic sensitivity chemical bond is ruptured, and charge on the surfaces of the nanoparticles is turned into positive charge from negative charge; and under the action of electrostatic repulsion, the hole plugging agent with the positive charge is separated from the surfaces of the mesoporous silica nanoparticles, the pore canal is exposed, and the biomacromolecule is quickly released. The pH responsive nanometer carrier can effectively solve the problems that the biomacromolecule leaks before arriving at target cells or cannot be controllably released under thespecific condition in cells, and controlled release under the specific pH condition of the loaded biomacromolecule is realized.
Owner:HUAZHONG UNIV OF SCI & TECH

Method for precision machining of nozzle type parts

ActiveCN105290738ASolution conditionsThe technical key to solve the problem that the surface roughness is difficult to guaranteeNumerical controlSurface roughness
The invention relates to a method for precision machining of nozzle type parts. The method comprises the following steps that (1) a turn milling composite machining center with double spindles and a precision numerical control all-purpose internal grinding machine are adopted for turning and milling internal and external profiles of the parts and grinding and machining the internal and external profiles of the parts in a one-time clamping state respectively; (2) a UGCAM program is adopted on the turn milling composite machining center, and a virtual simulation technology is applied to verify the correctness of a machining program; and (3) the machining process route, process method, positioning standard and process parameters of the nozzle type parts are designed. Twenty procedures of machining of an original common numerical control device are reduced to be existing fifteen procedures for the similar parts, six finish machining procedures after original heat treatment are reduced to be one procedure, five procedures are omitted, and by turning and milling the internal and external profiles of nozzles and precisely grinding the internal and external profiles of the nozzles in the one-time clamping state, the technical problem that the machining technological conditions and surface roughness of the parts are difficult to ensure is solved, and the aim of replacing grinding with finish grinding is achieved.
Owner:SHENYANG LIMING AERO-ENGINE GROUP CORPORATION

Thick-wall red copper and austenitic stainless steel non-prewarming arc melting and welding method

The invention discloses a non-preheating electric arc melting welding method of thick-wall red copper and austenitic stainless steel, which includes the following processing steps: 1. the method adopts tungsten electrode helium arc welding added with nickel-copper alloy welding wires of Phi 2 to 4mm for welding; the welding current is 180 to 400A; protective gas is pure helium, the flow volume of which is 10 to 15L per minute; the diameter of the tungsten electrode is Phi 4 to 5mm; the length for positioned welded joints is 10 to 15mm and the distance between the two welded joints is 100 to 150mm; 2. the method adopts the tungsten electrode helium arc welding added with the nickel-copper alloy welding wires of Phi 2 to 4mm for welding under the non-preheating condition; the welding current is 180 to 400A; the protective gas is helium, the flow volume of which is 10 to 15L/min; 3. after the backing welding, the non-preheating welding is used for filling the welded joint. The method solves the problems of the non-preheating welding of the thick-wall red copper and austenitic stainless steel and the hot cracking trend, which improves the solidification temperature, strength and plasticity of the welded joint and prevents the hot cracking and stomata by adding the nickel-copper alloy welding wire by hand.
Owner:中国船舶集团渤海造船有限公司

Method for negative-pressure boiling extraction and preparation of low-acid ginkgo extract

The invention relates to a method for negative-pressure boiling extraction and preparation of a low-acid ginkgo extract from ginkgo leaves. According to the method, crushed fresh ginkgo leaves or dry ginkgo leaves are used as a raw material, hydrous ethanol is used as an extraction solvent, negative-pressure boiling extraction is carried out, then a liquid extract is filtered and then pretreated by using quartz sand and microporous centrifugal filtration, a filtrate is separated and purified by using a ceramic membrane and an ultrafiltration membrane, a solution passing through the ultrafiltration membrane is concentrated by using a nanofiltration membrane, then ethanol is recovered, a concentrate is subjected to purification with a macroporous resin and phenolic acid removal with a deacidification resin, and negative-pressure microwave spray drying or vacuum freeze drying is carried out so as to obtain the low-acid ginkgo extract. The low-acid ginkgo extract prepared by using the method has a low acid value, high purity, ginkgetin content of more than 28%, lactone content of more than 8% and ginkgolic acid of no greater than 1 ppm, and the method may become a novel technology for industrial production of a low-acid ginkgo extract product.
Owner:邳州恒翔生物制品有限公司

Experimental tank system of riparian zone

InactiveCN102507135AMeet the riverConform to the environmentHydrodynamic testingPhysical modelEngineering
The invention relates to an experimental tank system of a riparian zone, belonging to the field of physical model experiments in hydraulic engineering. The experimental tank system comprises a tank control platform, an experimental composite-type tank, dual-cycle water supply systems, a dual-level flow control system and a switching system. According to the invention, a cyclic surface water supply system and a cyclic underground water supply system which are independent can be used for effectively controlling surface water of rivers to circulate at a higher speed and underground water to circulate at a low speed, and thus river and river bank water flow environments which further accord with natural conditions are provided for a riparian zone experiment; the dual-level flow control system can be used for adjusting and controlling level and flow boundary conditions of the surface water of the rivers and the underground water of the river bank simultaneously, so that the problems that level and flow conditions of the rivers can be independently adjusted only in the traditional river dynamics experiment and level and flow conditions of the underground water can be independently adjusted only in the traditional underground water experiment; and the electronic intelligent switching system can be used for intelligently adjusting and controlling switch-on and switch-off as well as openness of relative power supply switches, valves, tail gates and the like of the experimental tank system. The experimental tank system disclosed by the invention has high automation degree and is provided with an experiment control platform which is simple and easy to operate, so that a user can finish related operations of the experimental tank system of the riparian zone in the same control interface; and the experimental tank system has a fault prompt function and is convenient for emergent measure taking and equipment overhauling.
Owner:HOHAI UNIV

Sea fracturing method

InactiveCN104234681ASolve small spaceSolve the difficulty of moving equipmentFluid removalLine tubingFracturing fluid
The invention relates to a sea fracturing method. The method includes firstly performing fracturing geological design; mounting a fracturing wellhead, and mounting a fracturing wellhead high-pressure pipeline and connecting to a high pressure hose; loading fracturing equipment, suspending the fracturing equipment to a deck and fixing, concentrating the fluid container area, arranging a fluid feeding pump, a sand container, a sand mixing pump pry, a high-pressure injecting pump unit, a high pressure pipeline assembly and the like sequentially behind, preparing water, feeding material and preparing fracturing fluid; after a fracture construction ship arrives at a platform, adopting a tail laying manner, mooring, connecting to the high pressure hose at the gunwale of the platform, starting all high pressure injection pumps, inspecting circularly, and performing the pipeline pressure test; performing fracture construction according to the designed pump injection progress after the pressure test is qualified. The high pressure pipeline assembly is an assembly connected the high pressure injection pumps and high pressure injection pipeline, and the high pressure injection pumps are power equipment injecting fracture fluid into oil pipes through the high pressure pipeline assembly and the high pressure pipeline. The method is applied to oil testing and fracturing construction of sea exploration and development wells.
Owner:PETROCHINA CO LTD

Test device for cumulative damage of tunnel bottom structure under cyclic loading

ActiveCN106289844AAccurate Cumulative Damage CharacteristicsRealize quantitative correspondenceStructural/machines measurementElectricityEngineering
The invention discloses a test device for cumulative damage of a tunnel bottom structure under cyclic loading. Constraining forces around a specimen are provided by using a digital display jack to simulate the actual stress state of the tunnel bottom structure, a way of densely distributing springs at the bottom of the specimen is used to simulate a restriction effect of tunnel bottom surrounding rock for the bottom structure, and the upper part of the specimen is loaded through an MTS loading system to simulate the effect of train cyclic loading; cumulative damage characteristics of the specimen under the cyclic loading are tested by using a dynamic strain test system and a ceramic piezoelectric testing system. The method and device can simulate the influences of the surrounding rock of different levels by changing the stiffness of the springs at the bottom of the specimen, and further can quantitatively simulate the actual situations of local void or softening of the tunnel bottom surrounding rock through spring combinations of different stiffness and numbers, so as to solve the application problem of bottom constraint when the existing test method and device cannot consider unevenness of the local void or softening at the bottom of the specimen.
Owner:CENT SOUTH UNIV

Lithium-silicon supplementing material, preparation method thereof, electrode containing lithium-silicon supplementing material and battery

The invention relates to a lithium-silicon supplementing material and a preparation method thereof, and an electrode and a battery containing the lithium-silicon supplementing material, and the preparation method comprises the following steps: uniformly dispersing a silicon-containing material in a solvent to obtain silicon slurry A; uniformly dispersing a polycyclic aromatic organic compound containing hydroxyl or carboxyl in a solvent to obtain a solution B; mixing the solution B with the silicon slurry A, and uniformly dispersing and reacting to obtain modified silicon slurry C; uniformly dispersing a lithium source in a solvent to obtain a solution D; uniformly mixing the solution D with the modified silicon slurry C, and reacting to obtain lithium-supplementing silicon slurry E; and drying the lithium-supplemented silicon slurry E to obtain the lithium-supplemented silicon powder. The lithium-silicon supplementing material prepared by the invention can be used as a lithium ion battery negative electrode material to improve the initial coulombic efficiency and electrochemical performance of a battery, and can effectively solve the problem of low initial coulombic efficiency of lithium ion battery silicon and silicon-containing negative electrodes, and the preparation method has the advantages of low environmental requirements, mild and simple process, controllable lithium supplementing quality, and good economical efficiency and safety.
Owner:厦门高容纳米新材料科技有限公司

3D printing restrained forming auxiliary device and use method thereof

The invention discloses a 3D printing restrained forming auxiliary device and a use method thereof. The 3D printing restrained forming auxiliary device comprises a fixing portion, a sliding rail and a cooling device. The fixing portion is fixedly connected with the sliding rail and is used for being fixedly connected with a welding torch of 3D printing equipment, and the cooling device is slidably connected to the sliding rail and is used for cooling deposited metal generated in the printing process of the 3D printing equipment. The majority of heat of the deposited metal generated in the electric arc 3D printing process is brought away through cooling of a cooling block, solidification and high-temperature stay time of molten pool metal is greatly shortened, and the problems that heat accumulation of accumulated parts is serious, the heat dissipation condition is poor, a molten pool is excessively hot, an internal grain organization is thick and big, and mechanical property is low along with increase of the number of accumulated layers are solved. Besides, the 3D printing restrained forming auxiliary device is simple in structure and convenient to use and adjust, the machining margin required for a current electric arc 3D printing workblank forming piece is eliminated or reduced, production efficiency of electric arc 3D printing is improved, and the material utilization rate is increased.
Owner:HARBIN INST OF TECH AT WEIHAI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products