Sand-fixing adhesive material and method for improving desertified land
A bonding and land technology, applied in land preparation methods, chemical instruments and methods, soil conditioning materials, etc., can solve the problems of poor desertification land treatment effect, etc., and achieve the effect of improving land quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] (1) Mix the sand and fly ash evenly according to the volume ratio of 1:3.6,
[0021] Mix the components according to the following mass ratio evenly, fly ash 3.6, sand 1, calcium carbide slag 1, gypsum 0.5, grind on a ball mill and stir evenly, the particle size after grinding is controlled at 10-15mm, and then the mixed Add water into the material to form a slurry (the amount added can be adjusted according to the actual situation, in the present embodiment, according to fly ash 3.6, sand 1, carbide slag 1, gypsum 0.5, water 1.2), the slurry is placed on the surface Lay and solidify to form a planting layer with a slightly higher hardness. The depth of the planting layer is greater than 30cm. Then, 1500kg / mu of organic fertilizer is applied on the surface of the planting layer. After the organic fertilizer is applied, the cultivated land is leveled.
[0022] (2) After the soil is thawed in spring (March), choose Jerusalem artichoke tubers for sowing, 50-55kg of tuber s...
Embodiment 2
[0029] A sand-fixing adhesive material and a method for improving desertified land, comprising the following steps,
[0030] (1) Mix the sand and fly ash evenly according to the volume ratio of 1:3.6 to form a planting layer. The depth of the planting layer is greater than 30cm.
[0031] (2) After the soil is thawed in spring (March), choose Jerusalem artichoke tubers for sowing, 50-55kg of tuber seeds are needed per mu, the spacing between plants and rows is 0.5*0.5, and the sowing depth is 10-20cm. After 2 days of sowing Jerusalem artichoke, drip irrigation is carried out for 40 hours, and after 36 hours. Secondary drip irrigation for 40h, lay a layer of film after the drip irrigation is completed,
[0032] (3) 160-170 days after Jerusalem artichoke seeding, carrot seeds are sown, drip irrigation is carried out for 30 hours after carrot seeds are sown 1 day, and secondary drip irrigation is carried out for 30 hours after 7 days of drip irrigation.
[0033] (4) Remove the Je...
Embodiment 3
[0038] (1) Mix sand and fly ash evenly according to the volume ratio of 1:4 to form a planting layer. The depth of the planting layer is greater than 30cm.
[0039] (2) After the soil is thawed in spring (March), choose Jerusalem artichoke tubers for sowing, 50-55kg of tuber seeds are needed per mu, the spacing between plants and rows is 0.5*0.5, and the sowing depth is 10-20cm. After 2 days of sowing Jerusalem artichoke, drip irrigation is carried out for 40 hours, and after 36 hours. Secondary drip irrigation for 40h, lay a layer of film after the drip irrigation is completed,
[0040] (3) 160-170 days after Jerusalem artichoke seeding, carrot seeds are sown, drip irrigation is carried out for 30 hours after carrot seeds are sown 1 day, and secondary drip irrigation is carried out for 30 hours after 7 days of drip irrigation.
[0041] (4) Remove the Jerusalem artichoke stalks 30-35 days after the carrot is sown. After the Jerusalem artichoke stalks are removed, the carrots a...
PUM
Property | Measurement | Unit |
---|---|---|
depth | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com