A construction site simulation platform and simulation method based on dehumidification and anti-seepage equipment
A construction site and simulation platform technology, applied in design optimization/simulation, data processing applications, instruments, etc., can solve the problems of unpredictable anti-seepage equipment effects, affecting construction progress, cost waste, etc., achieve convenient and intuitive viewing, and improve construction Efficiency and the effect of reducing construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] There are many types of electro-osmotic anti-seepage and dehumidification. The entire dehumidification and anti-seepage equipment in this scheme includes a main control device, multiple data collection points and positive lines deployed inside the wall. The data collection points include the inner surface of the wall. The fixed collection point and the mobile collection point, the positive line inside the wall is used as the wall collection point inside the wall, the mobile collection point is provided with a mobile vehicle, the collection equipment is arranged on the mobile vehicle, and the wall of the construction space is provided with The track on which the mobile vehicle moves is laid sequentially along all the walls of the construction space to form a circular track. The above-mentioned dehumidification and anti-seepage equipment at the collection point transmit information with the terminal through wireless communication, and the terminal obtains the corresponding...
Embodiment 2
[0070] Such as figure 2 , 3 As shown, a simulation method of construction site based on dehumidification and anti-seepage equipment, the steps are as follows:
[0071] (1) The technicians have used the login module to log in, enter the background module, enter the calculation model management module to set the calculation model of the calculation model management module, and enter the calculation method to calculate the number, location and dehumidification speed of data collection points etc.; and set user permissions through the authority management module; pre-set information such as power consumption, dehumidification speed, covered detection range, wall excavation depth, width, and wall force of each dehumidification and anti-seepage device.
[0072] (2) The user logs in through the login module, enters the foreground simulation module, sets the environmental parameters through the environment parameter setting module, and enters the length, width, height, etc. of the a...