Water circulation system for side slope green restoration and construction method
A water cycle and slope technology, applied in drinking water installations, general water supply conservation, botanical equipment and methods, etc., can solve the problems of increasing transportation pressure and low utilization rate of rainwater, so as to reduce transportation pressure and reduce the cost of water transportation back and forth. time, improve work efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0044] Embodiment one: a kind of water circulation system for slope regreening, such as figure 1 As shown, along the direction of the retaining wall 6 toward the slope 4, it includes a water storage tank 1, a water filter tank 2, and a gravel reverse osmosis layer 3 in sequence, and spoil 5 is filled between the gravel reverse osmosis layer 3 and the slope 4.
[0045] The retaining wall 6 is made of M7.5 mortar block stones and is set along the surface of the slope 4. There are multiple water storage tanks 1, all of which are fixedly connected with the surface of the retaining wall 6 facing the slope 4 through concrete. The corresponding surfaces of the water storage tanks 1 are fixedly bonded, and the bonding surface of the adjacent water storage tanks 1 is provided with a connecting port, and a connecting pipe 16 is fixed at the connecting port and is close to the bottom surface of the water storage tanks 1, so that each water storage tank 1 interconnected.
[0046] like f...
Embodiment 2
[0053] Embodiment two: a kind of construction method for slope regreening, concrete steps include:
[0054] S1: Mountain slope cutting and step opening and cleaning: Thoroughly clean up the accumulation at the foot of the slope and the loose pumice and unstable blocks on the slope surface, and partially cut the slope at the top of the slope;
[0055] S2: Construction of retaining wall 6 and installation of water-resistant layer 7: The water-resistant layer 7 will be laid first, and then built with M7.5 mortar blocks;
[0056] S3: Drainage ditch 9 is built with bricks at the slope foot of retaining wall 6, plastered with M7.5 cement mortar in the ditch, with a thickness of 30mm, and the longitudinal slope of drainage ditch 9 is 0.5%. Set up C25 reinforced concrete drainage ditches at the top of the slope and the horseway, and set up C25 reinforced concrete longitudinal drainage ditches 9 at the water catchment on the slope;
[0057] S4: Fix the water storage tank 1 and the fil...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com