A method for precise positioning and implantation of double-walled steel cofferdams for rock-socketed foundations in deep water
A double-walled steel cofferdam, precise positioning technology, applied in infrastructure engineering, construction and other directions, can solve the problems of long consumption cycle, poor practicability of low pile caps, high cost, and achieve high control accuracy, simple structure and convenient operation. Fast and reliable results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0025] The method of precise positioning and implantation of double-walled steel cofferdams for deep-water drilling rock-socketed foundations in this embodiment uses a plane control system, a vertical control system and a measurement system; Precise positioning construction can solve the problem of difficult control of the plane position of the steel cofferdam and the verticality of the steel cofferdam caused by unfavorable conditions such as uneven blasting foundation pit and high water flow velocity under the condition of deep water bare rock. Such as figure 1 , wherein the plane control system includes an anchor ring 8, shore ground anchor 12, concrete anchor 13 in water, steel wire rope 9 and hoist 11; Steel pipe 4; as figure 2 , the measurement system includes a multi-beam depth sounder, a GPS positioning total station and a number of supporting prisms 14, etc.
[0026] The method for precise positioning and implantation of double-walled steel cofferdams for deep-water...