Processing equipment for recovery of waste power cables
A technology for power cables and processing equipment, which is applied in the field of waste power cable recycling processing equipment, can solve the problems of narrow application range and difficulty in effective promotion, and achieve the effects of improving crushing efficiency, reducing equipment complexity, and facilitating operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] refer to figure 1, the present invention proposes a processing equipment for recycling waste power cables, comprising: a conveyor belt 1, a cutting device, a crushing device and a separating device; The waste power cable on the conveyor belt 1 is cut; the discharge side of the conveyor belt 1 is provided with a conveying device, and the conveying device is used to transport the cut waste power cable into the crushing device; the crushing device includes a vibrating screen 16 , an upper crushing mechanism and a lower crushing mechanism, the vibrating screen 16 is located between the upper crushing mechanism and the lower crushing mechanism, and can reciprocate up and down; the separation device is located below the discharge port of the crushing device, and the The separation device is used to separate the copper rice grains and rubber grains falling from the discharge port of the crushing device.
[0034] refer to figure 1 , 3 , 6, the cutting device also includes a ...
Embodiment 2
[0046] refer to image 3 , 9 The difference between this embodiment and the above-mentioned embodiments is that the upper crushing mechanism includes an upper crushing assembly, the lower crushing mechanism includes a lower crushing assembly, and the upper crushing assembly includes a plurality of top-down distribution in the third The upper crushing blade 17 on the rotating shaft 12, the lower crushing assembly includes a plurality of lower crushing blades 18 distributed on the third rotating shaft 12 from top to bottom, the number, length and density of the upper crushing blade 17 are greater than Lower crushing blade 18; the crushing box is also provided with a crushing screen 19, the crushing screen 19 is located below the vibrating screen 16, and the upper pulverizing blade 17 is located between the vibrating screen 16 and the top wall of the pulverizing box 0 In the space, the lower crushing blade 18 is located in the space between the vibrating screen 16 and the crushi...
Embodiment 3
[0049] refer to figure 1 The difference between this embodiment and the above-mentioned embodiments is that the conveying device includes a hopper 27 and a conveyor 26, the hopper 27 is located at the discharge end of the conveyor belt 1, and a dust filter is provided in the hopper 27, and the dust filter The diameter of the mesh hole is smaller than the diameter of the waste power cable, the feed port of the conveyor 26 is located above the dust filter screen, and the discharge port of the conveyor 26 is connected with the feed port of the crushing box 0, crushing The feed port of bin 0 is located above the vibrating screen 16 .
[0050] Can directly enter in the hopper 27 after the waste and old cable breaks away from the conveyor belt 1, and the dust is deposited at the bottom of the hopper 27 after passing through the dust filter screen. Because the cable is preliminarily dedusted before the waste cable enters the crushing box, it can prevent the dust from being dispersed...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


