Construction Method of Plane Swivel of Cable-Stayed Bridge

A construction method and technology for cable-stayed bridges, applied in cable-stayed bridges, bridges, bridge construction, etc., can solve problems such as the difficulty of plane swivel construction, and achieve the effects of low construction difficulty, reasonable design, and simple construction

Active Publication Date: 2019-07-26
NO 1 ENG LIMITED OF CR20G
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Therefore, the plane swivel construction is very difficult

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction Method of Plane Swivel of Cable-Stayed Bridge
  • Construction Method of Plane Swivel of Cable-Stayed Bridge
  • Construction Method of Plane Swivel of Cable-Stayed Bridge

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0080] Such as figure 1 A kind of plane swivel construction method of the cable-stayed bridge shown, the main girder of the cable-stayed bridge constructed is a reinforced concrete beam and it is connected between two side-span beam sections 3 by two side-span beam sections 3 The mid-span beam section 4 is composed of two ends of the main beam respectively supported on two beam end pier 1; each side-span beam section 3 is composed of a side-span swivel beam section 14, a side-span The outer end beam section 15 is connected with a side span closing section 16 connected between the side span swivel beam section 14 and the side span outer end beam section 15, and each side span swivel beam section 14 is supported on On a main pier 2 and an auxiliary pier 5, each side span outer end beam section 15 is supported on a beam end pier 1, and the auxiliary pier 5 is located between the main pier 2 and the beam end support pier. between pier 1, see figure 2Each side-span swivel beam s...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a plane swivel construction method of a cable-stayed bridge. A main beam of the cable-stayed bridge is a reinforced concrete beam and is composed of two side span beam sectionsand a middle span bean section connected between the two side span beam sections. When performing plane swivel construction of the cable-stayed bridge, the plane swivel construction method includes the steps of 1, construction of swivel systems; 2, construction of a supporting structure of the lower portion of the bridge; 3, construction of forming of beam bodies; 4, construction of cable bent towers and installation of stay cables; 5, the plane swivel construction; 6, side span closure construction; and 7, mid-span closure construction. The plane swivel construction method of the cable-stayed bridge is simple in steps, reasonable in design, simple in construction and good in use effect. By combining two times of counterweight construction and lateral lifting of a swivel structure beforeswivel, the problem that the swivel structure spans auxiliary supporting piers can be effectively solved, the construction process of bridge swivel and closure is simply and quickly completed, the construction process is safe, the construction period is short, and the construction cost is low.

Description

technical field [0001] The invention belongs to the technical field of bridge construction, and in particular relates to a plane swivel construction method of a cable-stayed bridge. Background technique [0002] In recent years, during the construction of overspan railway bridges, in order to ensure the traffic safety of railway business lines, try to avoid setting up support construction on the road, the bridge swivel construction technology has been gradually promoted and applied, so that the bridge construction process will not affect the train traffic. Swivel construction is to build the main structure on one or both sides of the existing traffic line, and then use the rotation system to turn the main structure to the bridge design line position. Monitoring and control are required during the rotation process. According to the different rotation directions, the swivel method can be divided into vertical rotation method, horizontal rotation method and horizontal and verti...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D21/08E01D11/04
CPCE01D11/04E01D21/08
Inventor 欧阳林王忠诚刘俊斌梁之海章博杜越党宝文严朝锋王永丽王旭
Owner NO 1 ENG LIMITED OF CR20G
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products