Large-diameter extension arm type steel pipe pile and construction method thereof
A technology of large-diameter steel pipe piles, applied in sheet pile walls, foundation structure engineering, construction, etc., can solve the problems of smooth side walls and low bearing capacity, and achieve the effects of reduced consumption, low earth pressure, and convenient operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] Such as Figure 1-3 Shown: a large-diameter outrigger steel pipe pile, including a pile body 1 and a pile point 2, the pile body 1 is a steel pipe structure, the pile point 2 is a circular platform structure with an open bottom, and the pile body 1 Formed integrally with the pile tip 2, a partition 13 is arranged inside the pile body 1, and the partition 13 separates the inner cavity of the steel pipe of the pile body into an upper chamber 11 and a lower chamber 12 that are independent of each other; The lower cavity (the cavity of most of the pile body) can be filled through the soil plug that enters the lower cavity through the pile tip opening, reducing the amount of cement slurry;
[0042] The pile body of the upper cavity 11 is connected with an outrigger 4 that can protrude to the outside of the pile body 1 and insert into the soil; after the outrigger is inserted into the soil, the side friction and bearing capacity of the steel pipe pile are greatly increased. ...
Embodiment 2
[0056] Embodiment 2 is the construction method of Embodiment 1, and the specific method is: a construction method of a large-diameter outrigger type steel pipe pile, and its specific steps are as follows:
[0057] 1) Provide a large-diameter outrigger steel pipe pile as described in Embodiment 1;
[0058] 2) Set out the line to determine the pile position, use the lifting ring to suspend the large-diameter outrigger steel pipe pile directly above the pile position, and align the pile tip with the middle position of the pile position;
[0059] 3) Start the pile driver, and slowly insert the large-diameter outrigger steel pipe pile into the foundation;
[0060] 4) When the pile body reaches the predetermined depth, cover the pile cover 3, use a high-pressure air pump to inject high-pressure gas into the upper cavity through the high-pressure inflation hole 31 on the pile cover 3, and stabilize the pressure for 10 to 15 minutes to ensure that the The outrigger 4 is fully stretch...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com