Contact layer structure of ballastless track and surface layer of subgrade bed and laying method of contact layer structure
A technology of ballastless track and laying method, which is applied in the direction of track, ballast layer, road, etc., can solve the problems of vibration contact, void, etc., and achieve the effect of improving strength, large deformation modulus, and good elongation performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] like Figure 1-2 The structure of the contact layer between the ballastless track and the surface of the bed is shown. The ballastless track includes a base plate 2 and a sealing layer 3 located above the surface 1 of the bed. The sealing layer 3 is located in the lateral direction of the base plate 2. The contact layer structure includes a crushed stone bonding layer 4 arranged between the surface layer of the foundation bed 1 and the base plate 2 and the sealing layer 3, the first layer on the upper surface of the crushed stone bonding layer 4 An adhesive layer 5, a first waterproof structure 6 disposed between the first adhesive layer 5 and the base plate 2, and a second waterproof structure disposed between the first adhesive layer 5 and the sealing layer 3 7. The crushed stone bonding layer 4 includes a first crushed stone layer and a polymer adhesive filled in the crushed stone gaps of the first crushed stone layer.
[0046] The first adhesive layer 5 includes a ...
Embodiment 2
[0058] Compared with Example 1, the difference in the structure of the contact layer between the ballastless track of this example and the surface layer of the bed is as follows: image 3 As shown, the contact layer structure also includes a polymer adhesive filled in the gravel gaps of the second gravel layer and a second bonding layer 8 located on the upper surface of the second gravel layer. Both the second adhesive layer 8 and the polymer adhesive filled in the gap between the second gravel layers are emulsified asphalt.
[0059] The laying method of the contact layer structure between the ballastless track and the bed surface layer comprises the following steps:
[0060] 1) Sprinkle emulsified asphalt on the second gravel layer, the amount of emulsified asphalt spread is 1.2L / m 2 , a part of the emulsified asphalt penetrates into the gap of the second crushed stone layer, and a part is solidified on the upper surface of the second crushed stone layer to form the second ...
Embodiment 3
[0067] Compared with embodiment 2, the difference of the laying method of the ballastless track of the present embodiment and the contact layer structure of the subgrade bed surface layer is: 1) spread emulsified asphalt on the second crushed stone layer, and the spread amount of emulsified asphalt is 1L / m 2 , so that the emulsified asphalt penetrates into the gap of the second crushed stone layer; after the emulsified asphalt is solidified, polyurethane is spread on the upper surface of the second crushed stone layer, and the second bonding layer 8 is formed after the polyurethane is cured;
PUM