A system and method for optimal dispatching of hydropower station groups with separated front and rear ends
A hydropower station group and optimal scheduling technology, applied in data processing applications, instruments, calculations, etc., can solve problems such as entity classes, model algorithm design is not flexible enough, front-end and back-end are highly coupled, and front-end code is complex
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0063] In order to make the object, technical solution and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
[0064] The traditional hydropower station group optimization dispatching system usually adopts the MVC architecture mode, which separates the model (Model), view (View), and controller (Controller) to facilitate the design and management of application programs. However, with the continuous expansion of the system scale, the problem that the view depends on the model has become more and more prominent, and the front-end code has become more and more complex, full of various conventions, resulting in a high degree of coupling between the front and back ends and the inability to cooperate in a unified manner. The front-end is...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


