Whole-well-segment pressurized construction device and construction technology with device

An operating device, a technology of the whole well section, applied in drilling equipment, earthmoving, wellbore/well components, etc., can solve problems such as safety and environmental pollution, well production impact, oil and gas wells failing to meet on-site construction requirements, etc., to achieve safety High performance, improve construction efficiency

Pending Publication Date: 2019-01-15
高继宗
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the production process of oil and gas fields, oil and gas wells need to be regularly inspected and maintained. For the maintenance of pressured oil and gas wells, two solutions are generally adopted: one is to use well killing hydraulic wells, but after killing the wells, the oil and gas pipelines in the wells will be blocked , although the oil and gas wells will be overhauled, the production of the well will be greatly affected after the overhaul, and this construction process has been gradually eliminated; the other is the underpressure overhaul operation, and the basic process is to plug the production string with the plug The inner channel is sealed by the blowout preventer combination to seal the annular space of the oil jacket, and the maintenance is completed on the construction equipment equipped with the function of pressurization and lifting. plugging, but the actual production string is generally equipped with various downhole tools, and the downhole tools basically have diameter shrinkage, so it is basically difficult to achieve effective plugging of the last string. There are safety and environmental pollution problems when the plug is used for secondary plugging or spraying and spraying construction, so it is generally only used in water wells. For oil and gas wells, this construction process cannot meet the site construction requirements

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Whole-well-segment pressurized construction device and construction technology with device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0026] The overall structure of the embodiment of the present invention is referred to figure 1 As shown in Fig. 1, a device for working with pressure in the whole well section, the device includes a secondary function assembly, a main function assembly, and a swimming function assembly arranged sequentially from bottom to top, and the main function assembly includes The hollow telescopic tube 9, the upper coupling detector 10, the upper slip 11, the upper half seal 12, the upper full seal 13, the top half seal 14 and the airtight half seal 15, the parts of the main functional assembly are sealed and connected, Moreover, the vertical distance between the upper half seal 12 and the upper full seal 13 is greater than the length of the pipe string coupling. In this embodiment, the hollow telescopic tube 9 is a hollow power telescopic tube with hydraulic po...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a whole-well-segment pressurized construction device and a construction technology with the device. The device comprises an auxiliary function assembly, a main function assembly and a traveling function assembly successively from bottom to top, the traveling function assembly is connected with a power lifting device which has pressurized lifting function and used to lift orlay down the traveling function assembly, the traveling function assembly and the main function assembly are sealed reliably, the main function assembly is in sealing connection with the auxiliary function assembly, and the lower end of the auxiliary function assembly is in sealing connection with a well head via a cross unit in the well head.

Description

technical field [0001] The invention relates to a pressurized construction operation device for oil, gas and water wells in an oil field and a construction technology using the device, which is mainly used for later maintenance and repair when the oil and gas water wells in the oil field are under pressure. Background technique [0002] In the production process of oil and gas fields, oil and gas wells need to be regularly inspected and maintained. For the maintenance of pressured oil and gas wells, two solutions are generally adopted: one is to use well killing hydraulic wells, but after killing the wells, the oil and gas pipelines in the wells will be blocked , although the oil and gas wells will be overhauled, the production of the well will be greatly affected after the overhaul, and this construction process has been gradually eliminated; the other is the underpressure overhaul operation, and the basic process is to plug the production string with the plug The inner c...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21B19/00E21B19/16E21B19/10E21B33/03E21B33/04E21B47/00
CPCE21B19/00E21B19/10E21B19/16E21B33/03E21B33/04E21B47/00
Inventor 高继宗高丰翼
Owner 高继宗