Removal Method of Anchor Cable Reinforcement in Rock and Soil Strata
A technology of tendons and anchor cables, applied in construction, infrastructure engineering, sheet pile walls, etc., can solve problems such as uneven settlement, no working space for equipment, groundwater loss, etc., to avoid uneven settlement and avoid rock and soil strata. Intensity reduction effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] The removal method of the anchor cable reinforcement body in the rock and soil formation of the present embodiment, as figure 1 and figure 2 Shown: adopt the flexible hollow drill pipe 1 of existing set drilling core, drill pipe 1 is installed on the existing drilling machine 4 and operates. The drill bit at the bottom of the drill rod 1 of the present embodiment uses the drill bit 6 whose inner wall is provided with a grinding body 5, and the grinding body of the present embodiment adopts emery; specifically perform the following steps:
[0025] 1) Cover the drill pipe 1 on the anchor cable tendon body 2, start the drill pipe 1 to rotate and drill along the anchor cable tendon body 2 in the rock formation 3 to the anchoring section of the anchor cable tendon body;
[0026] 2) When the drill pipe 1 drills into the bottom end of the anchoring section of the anchor cable tendon body, the drill pipe 1 stops drilling but still keeps the drill pipe 1 rotating, and at this ...
Embodiment 2
[0032] The removal method of the anchor cable reinforcement body in the rock and soil stratum of the present embodiment is basically the same as that of the first embodiment, and is a change on the basis of the first embodiment. The following steps are specifically performed:
[0033] 1) The drill pipe 1 first uses the first drill bit without the grinding body 5, puts the drill pipe 1 on the anchor cable tendon 2, starts the drill pipe 1 to rotate and moves inward along the anchor cable tendon 2 in the rock and soil formation 3 Drilling into the anchor section of the anchor cable tendon 2;
[0034] 2) When the first drill bit reaches the bottom end of the anchoring section of the anchor cable, the drill pipe 1 stops drilling and rotating, exits the drill pipe 1, replaces the first drill bit with the second drill bit with a grinding body on the inner wall, and installs The drill pipe 1 of the second drill bit is set on the anchor cable tendon 2 again, enters along the anchor ca...