Removal Method of Anchor Cable Reinforcement in Rock and Soil Strata

A technology of tendons and anchor cables, applied in construction, infrastructure engineering, sheet pile walls, etc., can solve problems such as uneven settlement, no working space for equipment, groundwater loss, etc., to avoid uneven settlement and avoid rock and soil strata. Intensity reduction effect

Active Publication Date: 2020-09-22
SUZHOU NG FOUND ENG
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] 1. The space required by the equipment is too large, and many projects cannot be used, especially in foundation pit projects. The distance between the anchor head and the main structure is very small, many of which are less than 1 meter. This kind of equipment has no working space and its use is limited.
[0005] 2. The overall removal of the anchor cable (reinforcement body and cement body) will cause underground holes, resulting in a decrease in the strength of the surrounding strata, and there are major hidden dangers such as uneven settlement
[0006] 3. In areas with a high groundwater level, the large holes in which the anchor cables (reinforcement and cement body) are pulled out as a whole will cause a large amount of groundwater loss, especially in areas where the anchor cables pass through confined water, there will be a very large safety hazard

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Removal Method of Anchor Cable Reinforcement in Rock and Soil Strata
  • Removal Method of Anchor Cable Reinforcement in Rock and Soil Strata

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0024] The removal method of the anchor cable reinforcement body in the rock and soil formation of the present embodiment, as figure 1 and figure 2 Shown: adopt the flexible hollow drill pipe 1 of existing set drilling core, drill pipe 1 is installed on the existing drilling machine 4 and operates. The drill bit at the bottom of the drill rod 1 of the present embodiment uses the drill bit 6 whose inner wall is provided with a grinding body 5, and the grinding body of the present embodiment adopts emery; specifically perform the following steps:

[0025] 1) Cover the drill pipe 1 on the anchor cable tendon body 2, start the drill pipe 1 to rotate and drill along the anchor cable tendon body 2 in the rock formation 3 to the anchoring section of the anchor cable tendon body;

[0026] 2) When the drill pipe 1 drills into the bottom end of the anchoring section of the anchor cable tendon body, the drill pipe 1 stops drilling but still keeps the drill pipe 1 rotating, and at this ...

Embodiment 2

[0032] The removal method of the anchor cable reinforcement body in the rock and soil stratum of the present embodiment is basically the same as that of the first embodiment, and is a change on the basis of the first embodiment. The following steps are specifically performed:

[0033] 1) The drill pipe 1 first uses the first drill bit without the grinding body 5, puts the drill pipe 1 on the anchor cable tendon 2, starts the drill pipe 1 to rotate and moves inward along the anchor cable tendon 2 in the rock and soil formation 3 Drilling into the anchor section of the anchor cable tendon 2;

[0034] 2) When the first drill bit reaches the bottom end of the anchoring section of the anchor cable, the drill pipe 1 stops drilling and rotating, exits the drill pipe 1, replaces the first drill bit with the second drill bit with a grinding body on the inner wall, and installs The drill pipe 1 of the second drill bit is set on the anchor cable tendon 2 again, enters along the anchor ca...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a removal method of the anchor cable reinforcement body in geotechnical stratum, which belongs to the technical field. The existing flexible hollow drill pipe and the drill bit equipped with a grinding body on the inner wall are adopted in this method; the drill pipe, which jacketed outside of the anchor cable reinforcement body, is drilled into the rock-soil layer along the anchor cable reinforcement body; when the drill pipe is drilled to the bottom of the anchorage section of the anchor cable reinforcement body, it stops drilling and the grinding body stays at the bottom of the anchor cable reinforcement body; or when the drill bit without grinding body is drilled to the bottom of the anchorage section, then the drill pipe is withdrawn and the drill bit with grinding body is used for re-entry; keep the drill pipe rotating, the drill pipe will swing along the radial direction of the anchor cable reinforcement body, the grinding body will form continuous grinding to the bottom end of the anchor cable reinforcement body under the rotation and swing of the drill pipe, and eventually cuts off or wears the anchor cable reinforcement body at the bottom end; Finally, the cut or worn anchor cable reinforcement body will be pulled out.

Description

technical field [0001] The invention relates to a method for removing anchor cable tendons in rock and soil strata, and belongs to the technical field. Background technique [0002] In the field of geotechnical engineering, the tendons of many anchor cables used are often left behind in the formation to form obstacles after use, which affects development. In recent years, although there are technologies such as recyclable anchor cables, there are still some phenomena that are partially destroyed and cannot be recycled. [0003] At present, methods such as cutting and manual excavation are used for a large number of remaining tendons in the rock and soil layer, but the best method is to drill cores, that is, use casings to remove the lateral connection between the anchor cable and the surrounding soil, and then remove the tendons. The body and cement body were removed as a whole. However, in actual operation, there are several major disadvantages: [0004] 1. The space req...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D5/76
CPCE02D5/765
Inventor 周建明杜明祥范惠菊陆晓明
Owner SUZHOU NG FOUND ENG