Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

A train running performance data driven running chart redundancy time layout acquisition method

A redundant time, data-driven technology, applied in data processing applications, instruments, forecasting, etc., can solve the problems of high time utilization, untargeted solutions, and high frequency of late occurrences, so as to improve pertinence and applicability and practical effects

Inactive Publication Date: 2019-04-05
SOUTHWEST JIAOTONG UNIV
View PDF4 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In order to solve the above-mentioned problems existing in the prior art, the purpose of the present invention is to provide a method for obtaining the redundant time layout of the running chart driven by the actual train running performance data, and find the key stations and sections of the road network according to the train running delay data, that is, the redundant time utilization Sections and stations with a high rate of delays and high frequency of delays, and find key parameters that affect the efficiency of redundant time utilization. Based on this, further optimization of redundant time can be achieved, the robustness of the operation diagram can be enhanced, and it can be used to find out the advance time of each section and station. The assigned redundant time value enables each late train to be restored, which is used to solve the problems existing in the existing technology that it is difficult to provide support for real-time dispatching and command, the scheme is not targeted, and the late train cannot be restored to the maximum extent.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A train running performance data driven running chart redundancy time layout acquisition method
  • A train running performance data driven running chart redundancy time layout acquisition method
  • A train running performance data driven running chart redundancy time layout acquisition method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0077] Such as figure 1 As shown, the method for obtaining the redundant time layout of the operation diagram driven by the actual train operation performance data includes:

[0078] S1: According to the actual train operation data, extract the delayed train operation data, and obtain the delayed train recovery time and its influencing factors;

[0079] The actual train running performance data used in this embodiment comes from the Wuhan-Guangzhou high-speed railway under the jurisdiction of China Railway Guangzhou Bureau Group Co., Ltd. (hereinafter referred to as Guangzhou Railway Group), such as Figure 5 As shown, the total length of the Wuhan-Guangzhou high-speed railway is 1069km, with a total of 18 stations, a design speed of 350km / h, and an operating speed of 310km / h. The number of trains every day, the arrival and departure stations, the planned and actual arrival and departure times of each train at each station, the highest train speed, the average speed, etc., th...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of railway traffic, and relates to a train operation actual data driven running chart redundancy time layout acquisition method, which comprises the following steps: S1, extracting a late train operation record according to train operation actual data, and acquiring train late recovery time and influence factors thereof; S2, using a ridge regression model to obtain a ridge regression coefficient, namely an influence coefficient, of each influence factor; S3, determining an objective function of the redundant time layout optimization model accordingto the train late recovery time and the influence coefficient; S4, obtaining train operation constraint conditions according to the train operation diagram and the train operation limitation conditions; And S5, according to the train operation diagram and the train operation constraint conditions, solving the redundant time layout optimization model, and obtaining a redundant time layout scheme. The problems that in the prior art, support is difficult to provide for real-time scheduling and commanding, the scheme is not targeted, and recovery maximization of the late train cannot be achieved are solved.

Description

technical field [0001] The invention belongs to the technical field of railway traffic, and in particular relates to a method for obtaining redundant time layout of a running chart driven by actual train running performance data. Background technique [0002] The railway train operation diagram (hereinafter referred to as the train operation diagram) is a technical document used to indicate the train's operation in the railway section and the arrival, departure or passing time at the station, and is the basis for organizing the train operation of the whole railway. [0003] The procedures for specifying the section occupied by each train, the arrival and departure (or passing) time of the train at each station, the running time of the train in the section, the stop time of the train at the station, the route of the locomotive, the weight and length of the train, etc. It is an illustration of the train timetable, which stipulates that each train will run in the interval and a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/30
CPCG06Q10/04G06Q10/067G06Q50/40
Inventor 黄平文超李忠灿汤轶雄蒋朝哲
Owner SOUTHWEST JIAOTONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products