The invention provides a foundation treatment process, and relates to the technical field of foundation treatment. The foundation treatment process specifically comprises the following steps: S1,
geological survey and three-
dimensional modeling; s2, establishing a micro-seismic
monitoring system; s3, applying a self-healing material; s4, construction of a rotary drilling rig; s5, performing real-time construction monitoring and adjustment; s6, detecting the hole forming quality of the
pile foundation; s7, concrete is poured, and a self-healing material is injected; and S8, geological treatment and acceptance after construction. Safety and accuracy of the construction process can be guaranteed by monitoring changes of underground rock strata and
karst caves in real time, the construction quality of each
pile foundation is guaranteed through
data analysis and dynamic adjustment of a construction scheme, self-repairing of the material can be achieved through the
fungus self-healing
cement-based material, durability and stability of the
pile foundations are enhanced, and the construction quality of the pile foundations is improved. The long-
term effect of foundation treatment is improved, the later maintenance cost is reduced, the pile foundation construction quality under the complex
karst geological condition can be ensured, the construction efficiency is improved, the cost is reduced, and the
engineering safety and stability are ensured.