Structure for connecting flood intercepting ditch and inspection well
A technology for inspection wells and flood intercepting ditches, which is applied to drainage structures, water/sludge/sewage treatment, sewage discharge, etc., can solve the problems of increased difficulty in setting up sewage lifting pump stations, unfavorable vertical stability of drainage pipes, and large ground elevation differences Large and other problems, to achieve the effect of avoiding direct entry into the river, simple structure and stable operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] Such as Figure 1-Figure 2 As shown, a structure connecting the flood intercepting ditch and the inspection well, including: falling water ladder 1, involute section 2, energy dissipation pool 3, grille 4, retaining wall 5, mountain slope line / sidewalk outer line 6, Connecting pipe 7, ground 8, inspection well 9. According to the engineering design requirements, the runoff of a flood intercepting ditch in a certain mountain is treated, and the treatment scale is 60L / s. The rainstorm runoff on the surface of the mountain rolls down from the mountain, first through the falling water ladder, secondly through the energy dissipation pool 3 and the grille 4, and finally through the connecting pipe 7 and discharged into the inspection well.
[0026] According to the sequence of upstream and downstream, the water drop ladder 1, the energy dissipation pool 3, the grid 4 and the connecting pipe 7 are firstly set.
[0027] The series of the falling water ladder 1 is determined a...
Embodiment 2
[0034] Such as Figure 3-Figure 4 As shown, a structure connecting the flood intercepting ditch and the inspection well, including the drop ladder 1, the involute section 2, the energy dissipation pool 3, the grille 4, the retaining wall 5, the foot line of the mountain slope / sidewalk outer line 6, the ground 8. Stilling ridge 10 and cover plate culvert 11.
[0035] According to the engineering design requirements, for the connection between the flood intercepting ditch and the slab culvert, the return period of the flood intercepting ditch is 10 years, and the treatment scale is 60L / s. Compared with Embodiment 1, this embodiment mainly cancels the connecting pipe 7 and adds the stilling ridge 10 .
[0036]According to the upstream and downstream sequence, set the drop ladder 1, the energy dissipation pool 3, and the grille 4. The drop ladder has 12 steps, the height of each step is 300mm, and the width is 150mm. The total height of the ladder is 3.6m, and the width is 1.8m....
PUM
Property | Measurement | Unit |
---|---|---|
Height | aaaaa | aaaaa |
Width | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com