Advanced reinforcement construction method for constructing tunnel in stratum without self-stabilizing capability
An advanced reinforcement and construction method technology, applied in tunnels, tunnel linings, underground chambers, etc., can solve problems affecting construction speed and construction period, endangering human safety, cracking and rheology, etc., to shorten the construction period and improve construction efficiency. The effect of high speed and practicality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Such as figure 1 As shown, a plurality of horizontal jet grouting piles-1 are evenly distributed along the edge of the vault at the opening position, and the horizontal jet grouting piles-1 are engaged with each other in the diameter direction to form a consolidated vault;
[0036] On other opening slopes except the position of the opening, a plurality of evenly distributed horizontal jet grouting piles 2 4 perpendicular to the surface of the opening opening slope can be arranged, and the top of each horizontal jet grouting pile 2 4 is buried with a connecting block 1. Spray concrete on the upward slope of other openings except for the opening position, and lay steel wire rope mesh one 5 above the sprayed concrete layer, steel wire rope mesh one 5 and connection block one are fastened and connected by anchor bolts one, above steel wire rope mesh one 5 Lay high-strength permeable polymer mortar to form the protective surface layer 1, and the standard maintenance is 28 da...