Middle partition wall used in tunnel and installation device and method thereof
A technology for installing equipment and installation methods, which is applied in the direction of tunnels, tunnel linings, mining equipment, etc., can solve problems such as long construction period, long construction period, and inconvenient operation, so as to improve installation accuracy and overall strength, reduce cost input, and improve The effect of installation speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] According to the above content, it can be seen that the partition wall in the prior art needs to be poured in the tunnel to form a T-shaped base, and then the prefabricated wall is fixedly connected to the T-shaped base by pouring again. Obviously, the partition wall in the prior art needs a long construction period to complete the installation work. In addition, welding, cutting, and concrete pouring operations are required many times during the construction process, which not only increases the construction cost, but also aggravates the safety risks of construction workers.
[0042] The partition wall in the tunnel, the installation equipment and installation method for the partition wall proposed by the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. The advantages and features of the invention will be apparent from the claims and the following description. It should be noted that al...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


