Formwork system and construction method for the second lining of municipal underground passages

An underground passage and formwork technology, applied in tunnel linings, underground chambers, tunnels, etc., can solve the problems of poor concrete pouring, inconvenient passage, waste of concrete, etc. The effect of demolition and improvement of construction efficiency

Active Publication Date: 2020-10-02
SINOHYDRO BUREAU 8 CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

(2) During the construction of the second lining, due to the influence of the internal support of the primary support, the formwork trolley cannot be used, and only the support system can be used. However, after the support system is fully covered, it is inconvenient to reinforce the formwork and pour concrete, so it is necessary to solve the inside of the support access problem
(3) The construction of the second lining needs to be carried out after the initial support of the underground excavation is completed, and the working environment is a fully enclosed space, and vertical hoisting of materials or components cannot be carried out, so the lightweight and operability problems of the formwork system need to be solved
[0003] According to the current construction situation of the same type of project, the above construction problems of the second lining of the municipal underground passage cannot be properly solved
Most of the secondary lining construction of municipal underground passages adopts the full frame and wooden formwork system, but this construction scheme has the following construction defects: (1) Due to the full frame system, it is inconvenient for workers to strengthen the formwork and pour concrete
(2) The wooden formwork has low rigidity and is easy to deform, and the connection between the wooden formwork is not reliable, which is easy to cause wrong platform
At the same time, it is difficult to assemble the designed angle at the joints of the wooden formwork at the armpit corners, which will easily cause the lines to be unsmooth after the concrete is poured.
(3) When pouring concrete, ordinary concrete needs to be cut and vibrated on the surface of the formwork, which will affect the appearance after molding
Or directly vibrate the surface of the formwork, causing the concrete to be vibrated and not dense
(4) When pouring concrete, the pump pipe is directly inserted into the formwork pouring hole, causing the concrete to flow out when the pump pipe is pulled out, resulting in poor concrete pouring of the second lining and waste of concrete

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Formwork system and construction method for the second lining of municipal underground passages
  • Formwork system and construction method for the second lining of municipal underground passages
  • Formwork system and construction method for the second lining of municipal underground passages

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0051] The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.

[0052] Such as Figure 1 to Figure 13 As shown, the municipal underpass two-lined construction formwork system of this embodiment includes a two-lined side wall formwork set 100, a second-lined roof formwork set 200, a bracket 300, and a second-lined side wall formwork set 100 and a second-lined roof formwork set 200 The axillary corner formwork group 700, the second lining side wall formwork group 100 includes side wall formwork 110, side wall back flute 120, the second lining top panel formwork group 200 includes top panel formwork 210 and roof back flute 220, and the bracket 300 includes a plurality of horizontal rods 310 and a plurality of vertical rods 320, the vertical rods 320 are propped between the top plate back corrugated 220 and the second substrate board 410 of the second lining 400, the horizontal rods 310 are supported ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a municipal underground channel second lining construction template system and construction method. The municipal underground channel second lining construction template systemcomprises a second lining side wall template group, a second lining top plate template group, a bracket and an axillary angle template group connecting the second lining side wall template group andthe second lining top plate template group. The second lining side wall template group comprises a side wall template and a side wall back edge; the second lining top plate template group comprises atop plate template and a top plate back edge, and the axillary angle template group comprises an axillary angle template and an axillary angle template back edge; and the bracket comprises a pluralityof horizontal rods and a plurality of vertical rods, the vertical rods are arranged between the top plate back edges and second lining bottom plates of second lining in a back shore mode, the horizontal rods are arranged between the side wall back edges of the side walls in a back shore mode, and a door opening is formed in the middle of the bracket. The construction method comprises the steps that original center vertical column profile steel is removed by adopting the mode of removing one every other one; steel bars of second lining side walls and top plates are installed; the template system is constructed; and second lining pouring is poured. According to the municipal underground channel second lining construction template system, scaffolds are not required to be arranged and the door opening for convenient passing is formed, and settlement deformation of an arch top can be controlled by the construction method while the channel space is ensured to be maximized.

Description

technical field [0001] The invention relates to the construction of municipal underground passages, in particular to a formwork system and a construction method for the second lining of municipal underground passages. Background technique [0002] Municipal underground passages have the following characteristics: (1) During the construction of the second lining, the internal support of the primary support needs to be removed, which may cause the settlement of the primary support vault to exceed the limit, so the settlement risk of the primary support vault needs to be resolved. (2) During the construction of the second lining, due to the influence of the internal support of the primary support, the formwork trolley cannot be used, and only the support system can be used. However, after the support system is fully covered, it is inconvenient to reinforce the formwork and pour concrete, so it is necessary to solve the inside of the support traffic problems. (3) The constructi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D11/10
CPCE21D11/10E21D11/105E21D11/107
Inventor 伍浩常彦博雷振朱杰朱鹏张林彪
Owner SINOHYDRO BUREAU 8 CO LTD