A construction method for encountering untreated karst caves or fissures during shield tunneling
A construction method and untreated technology, applied in earthwork drilling, wellbore/well components, sealing/isolation, etc., can solve problems such as ground subsidence, endangering safety, lowering, etc., and achieve improved performance, reduced difficulty, and increased specific gravity Effect with Viscosity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] Below in conjunction with embodiment the present invention is further described.
[0037] The embodiment is for a shield section of the Guangzhou Metro, which is constructed using the shield method. The length of the left line of the section is 1098.87m, and the length of the right line of the section is 1099.188m. The buried depth is about 13.5-19.8m. The landform along this interval is mainly the alluvial plain of the Pearl River Delta, the terrain is relatively flat, the ground elevation is about 6.0-10.0m, and the Quaternary alluvial soil layer and sand layer are developed. The formations mainly traversed in this interval include silt-fine sand, medium-coarse sand, gravel sand, silty clay (flow plastic ~ soft plastic), silty clay (plastic), silty soil, limestone residual soil (soft plastic), limestone micro-weathered strata and soil caves, caves . In the early stage of shield construction, 5m / hole was re-intensively surveyed, and the penetration rate was fou...