Construction method of foot looking opening pull type self-stabilization large-formwork wall

A self-stabilizing, large formwork technology, applied in artificial islands, water conservancy projects, infrastructure projects, etc., can solve the problems of steel scars and holes, labor and physics, and cumbersome construction processes, etc., to ensure that it will not be damaged, The effect of improving work efficiency and shortening assembly time

Inactive Publication Date: 2019-08-30
SHAANXI HUASHAN ROAD & BRIDGE ENG
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In the past, the conventional construction of the wall of the underground comprehensive pipe gallery mostly used the construction technology of steel pipe brackets and double-drawn screws to fix the inner and outer formwork. To ensure that the formwork is not easy to deform, the construction process is cumbersome and consumes a lot of manpower and physics. After the concrete pouring is completed, there are many scars and holes on the surface of the steel reinforcement. The self-waterproof performance is poor and the decoration is very difficult. It is difficult to achieve the desired effect.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of foot looking opening pull type self-stabilization large-formwork wall
  • Construction method of foot looking opening pull type self-stabilization large-formwork wall

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0055] Such as figure 1 As shown, the locking foot pull type self-stabilizing large formwork wall construction method of the present invention comprises the following steps:

[0056] Construction preparation: Calculation of formwork side pressure:

[0057] P 1 =0.22*γ 0 *T 0 *β 1 *β 2 *V 1 / 2 (1)

[0058] P 2 = γ 0 *H (2)

[0059] Among them, γ 0 is the gravity density of concrete, take 24.0kN / m 3 ;

[0060] T 0 is the initial setting time of concrete, which can be determined according to the actual measurement. If there is no data, it is 200 / (T+15), T is 25, and the initial setting time is 5;

[0061] T is the temperature of the concrete mannequin, which is 25°C;

[0062] V is the concrete pouring speed per hour, take lm 3 / h;

[0063] H is the total height from the calculation position of the concrete lateral pressure to the top surface of the concrete;

[0064] beta 1 is the correction coefficient for the influence of admixtures, the project concrete is n...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Yield strengthaaaaaaaaaa
Login to View More

Abstract

The invention relates to the technical fields of wall construction of underground comprehensive pipe galleries, down-traversing tunnels and expressway culverts of municipal engineering, in particularto a construction method of a foot looking opening pull type self-stabilization large-formwork wall. Self stabilization can be achieved, external force for supporting is not needed, operation is convenient, manpower and material resources are saved, and the work efficiency and construction quality are improved. The method comprises the following steps of (1) construction preparation; (2) survey and setting out, wherein a, a provided control point is retested and checked, b, the provided control point is adopted as a first-stage control point, control point encryption is carried out, and c, a GPS static distribution and control scheme is made, the GPS dynamic position technology is utilized for field setting out, and pale grey is used for making excavation line marks; (3) foundation pit excavation; (4) macadam cushion layer pavement; (5) foundation formwork mounting; (6) foundation concrete pouring; (7) steel bar binding; (8) inner formwork and outer formwork mounting, wherein a, formworks are in place, and b, the formworks are fastened; (9) wall concrete pouring; and (10) formwork demounting and maintenance.

Description

technical field [0001] The invention relates to the technical field of construction of underground comprehensive pipe corridors, underpass tunnels, and expressway culvert walls of municipal engineering, in particular to a construction method for locking feet and opening self-stabilizing large formwork walls. Background technique [0002] As one of the important infrastructures of the city, the comprehensive pipe gallery is of great significance in the process of urban development. Since the comprehensive pipe gallery is an underground structure, there are many types of pipelines laid in it, including electricity, fire protection, gas, water supply and drainage, etc. The waterproof performance of the integrated pipe gallery itself is in accordance with the national regulations "Technical Specifications for Urban Integrated Pipe Gallery Engineering" GB50838-2015. Efforts should be made to improve the waterproof construction technology of the comprehensive pipe gallery to ensur...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D29/045E01F5/00
CPCE01F5/005E02D29/10
Inventor 宋召军杨永锋史军海方晓明刘军涛赵红星何卫荣张华胡永光姬文渊尚广旗严坤张陕北李佳乔刘红涛张拓茹国梁马强李伟郁王风强
Owner SHAANXI HUASHAN ROAD & BRIDGE ENG