Problems solved by technology

[0005] Aiming at the deficiencies of the prior art, the present invention provides a three-in-one underground continuous wall construction method, which solves the problem that the existing underground continuous wall needs to select materials according to different functions, and at the same time, additional construction is required for different functional walls. , occupies a wide area, consumes a lot of resources, and at the same time, the construction is more cumbersome, which brings many troublesome problems to the project

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method of three-wall-in-one underground continuous wall
  • A construction method of three-wall-in-one underground continuous wall
  • A construction method of three-wall-in-one underground continuous wall

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0031] see Figure 1-5 , the embodiment of the present invention provides a technical solution: a three-in-one underground continuous wall construction method, specifically comprising the following steps:

[0032] Step 1. Prepare for measurement: through calculation and on-site load test, determine the reasonable penetration depth of the load-bearing underground diaphragm wall, and then determine the prefabricated floor 1 and stable floor 2 according to the ac...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a three-wall-in-one construction method for an underground continuous wall. Step 1: prepare for measurement; Step 2: assemble the base plate; The second stabilizing frame at the bottom slides into the pouring hole assembled in step 3, and at the same time, clamp the first connecting cylinder at the bottom of the prefabricated connector on the surface of the second connecting cylinder; step 5, top plate assembly; step 6, watering and fixing; this The invention relates to the technical field of civil engineering. The three-wall-in-one underground diaphragm wall construction method first uses prefabricated components for assembly. The structure is simple, the assembly saves more time, the construction speed is faster, and the efficiency is better. Stable, not only can achieve the effect of waterproofing and soil retaining, but also can achieve the function of weighing, realize the purpose of integrating three walls, save space and resources, and reduce construction troubles.

Description

technical field [0001] The invention relates to the technical field of civil engineering, in particular to a three-wall-in-one underground continuous wall construction method. Background technique [0002] The underground diaphragm wall is a kind of trenching machine used on the ground in the remote foundation project. Along the peripheral axis of the deep excavation project, under the condition of mud retaining wall, a narrow and long deep groove is excavated. After cleaning the groove, hang it in the groove Put the reinforcement cage, and then use the conduit method to pour the underwater concrete to form a unit groove section, so that a continuous reinforced concrete wall is built underground, which can be used as a water interception, seepage prevention, load bearing, and water retaining structure. Construction of deep foundation pit support and reverse construction in dense building complexes can be used in various geological conditions, including construction in sandy ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D5/20
CPCE02D5/20
Inventor 钟玉红吴灶伟王欢
Owner 湖南三科土木特种工程施工有限公司