Eureka AIR delivers breakthrough ideas for toughest innovation challenges, trusted by R&D personnel around the world.

Agile configuration method for over-standard flood multi-combination regulation and control calculation

An ultra-standard and flood technology, applied in the direction of calculation, computer-aided design, design optimization/simulation, etc., can solve the problems of insufficient timeliness of results, cumbersome operation process, affecting the decision-making efficiency and emergency response speed of ultra-standard flood dispatching, etc. Solve the problem of module segmentation and reduce the effect of manual operation

Active Publication Date: 2019-10-25
CHANGJIANG SURVEY PLANNING DESIGN & RES
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] In the above-mentioned process, the simulation calculation of flood dispatching and control in the basin, which should have been completed continuously, was artificially divided and blocked, and the data connection and information processing between different calculation models also mostly relied on manual intervention. The operation process was cumbersome and the workload was huge. Moreover, the risk of misoperation is high, and the calculation efficiency of the whole-process dispatch control simulation for the flood evolution in the basin is low, and the timeliness of the results is seriously insufficient, which greatly affects the dispatch decision-making efficiency and emergency response speed of super-standard floods

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Agile configuration method for over-standard flood multi-combination regulation and control calculation
  • Agile configuration method for over-standard flood multi-combination regulation and control calculation
  • Agile configuration method for over-standard flood multi-combination regulation and control calculation

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0037] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments to facilitate a clear understanding of the present invention, but they do not limit the present invention.

[0038] Such as figure 1 As shown, in combination with a watershed subdivision covering reservoirs, river sections, measuring stations, dikes, flood storage and detention areas, sluices, pumping stations, river sections and other water conservancy objects, the method of the present invention is used to build the specific implementation of multi-combination control and calculation of superstandard floods The way is as follows:

[0039] (1) Digital modeling of flood control system

[0040] Establish 8 types of water conservancy, including reservoir (RV), river reach (RR), measuring station (ST), dike (DK), flood storage and detention area (SA), sluice (SL), pumping station (PS), and river section (RS) Object types, and carry out di...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

Modularization, configuration and process engine technologies are introduced into the field of basin flood scheduling control. The invention provides an agile configuration method for over-standard flood multi-combination regulation and control calculation. The agile configuration method comprises the following steps: packaging various model algorithm components into a node library; selecting onenode from the node library as a starting point node of the process; calculating an object for the initial node coupling, and verifying whether the current node and the object coupling are valid according to a rule base; creating subordinate nodes according to the combination requirements; coupling a calculation object for the subordinate node; repeating the steps to circularly create a new subordinate node according to the combined calculation requirement, and completing the corresponding node flow direction and object coupling verification until the node is completely created; and collectingall input information of the node flow, starting a calculation task, and outputting a summary result.

Description

technical field [0001] The invention relates to the technical field of river basin flood simulation and scheduling control, in particular to an agile configuration method for multi-combination regulation and calculation of superstandard floods. Background technique [0002] The essence of flood control calculation is the deep application of computer technology to simulate the propagation evolution and dispatch control process of flood in the basin under its flood control system. The flood control system of my country's river basins is mainly composed of various water conservancy objects such as reservoirs, river sections, measuring stations, dikes, flood storage and detention areas, sluices, pumping stations, etc. The joint dispatching and control of various water conservancy project object groups is to improve the flood control capacity of the river basin and reduce the It is an important measure to reduce the risk of flood inundation and reduce the loss of flood disasters. ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F17/50G06Q50/26
CPCG06Q50/26G06F2111/04G06F30/20Y02A10/40
Inventor 唐海华罗斌黄艳李琪周超
Owner CHANGJIANG SURVEY PLANNING DESIGN & RES
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products