8-shaped double-wall steel cofferdam and construction operation process
A double-walled steel cofferdam, figure 8 technology, applied in infrastructure engineering, construction, etc., can solve the problems of uneven structural force, large welding workload, slow installation speed, etc. The effect of less welding workload and reduced quantity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0043]The present invention will be described in detail below in conjunction with the accompanying drawings, and the technical solutions in the embodiments of the present invention will be clearly and completely described. Apparently, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0044] The present invention provides a 8-shaped double-walled steel cofferdam through improvement. Plate 5, outer ring plate 6, vertical rib 7, vertical box 8, edge foot 9, steel pipe inner support 10 and back-sealing concrete; inner wall plate 1, outer wall plate 2 and vertical box 8 form the main body of a figure-eight double-wall steel cofferdam , the inner side of the inner wall plate 1 and the outer wall plate 2 are respectively welded with vert...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com