Embodiment 1
[0031] like figure 1 , figure 2 As shown, the oil water mixed hules provided by the present embodiment and the reactive stress measuring device, including the experimental line unit 1, the rotary operation unit 2, and the temperature control unit 3.
[0032] The experimental pipeline unit 1 is used to simulate the operation of the pipe oil water mixing and the reacture process. The experimental line unit 1 employs the L-type combination line 11, the L-type combination line 11 includes a pressure pipe section 111 and a test pipe section 112, and the pressure pipe section 111 and the test pipe section 112 are detachable connected by underwater solenoid valve 113, the L-shaped combination The pressure pipe section 111 of the line 11 and the top opening end of the test pipe section 112 each have end caps 114, wherein the underwater solenoid valve 113 is connected to an external power source 116 by a solenoid valve power supply line 115.
[0033] The rotation operation unit 2 is used t...
Embodiment 2
[0039] In this example, the apparatus of the combined pipeline oil water mixing stop is based on the apparatus of Example 1 and the simulation of the reactive process is divided into operation of the initial stream observation, standing and reboot stress test. The specific process is:
[0040] S1, before the experiment
[0041] Check if the experimental device is in normal operation, including whether the cooling heat system 33 is normal, whether the heat transfer flow path 34 is normal, whether the rotating bearing 23 and the rotary electric machine 24 are normal, the transparent water tank 31 is normal, underwater solenoid valve 113 Whether you can switch normally.
[0042] S2, the oil sample preparation is rotated before the pipeline
[0043] According to the determined experimental scheme, a mixing ratio of oil and water is determined, and the temperature required for the experiment is set by the cooling heat system 33, and the electromagnetic valve 113 of the oil sample injec...