tunnel shaft construction method

A construction method and shaft technology, applied in shaft equipment, sinking, earthwork drilling and mining, etc., can solve the problems of poor safety and quality, long single cycle time, and difficult maintenance in the later stage, so as to eliminate waterproofing and drainage Leakage, short single cycle time, good waterproof and drainage effect

Active Publication Date: 2021-09-21
CHINA RAILWAY 19TH BUREAU GRP SECOND ENG CO LTD
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The existing tunnel shaft construction method has the problems of slow construction speed and too long single cycle time of each process. Generally, the cycle time of mechanical construction is between 19-22 hours, which affects the construction progress
In addition, the waterproof and drainage measures are poor, and the safety and quality in the later stage cannot be well guaranteed
According to incomplete statistics, 70% of every 100 shafts in the current shaft project are maintained in the later period due to drainage leakage and frost heaving in the alpine region. However, the later maintenance is particularly difficult, which greatly increases the construction cost

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] Excavation of shaft wellhead site and wellhead section;

[0035] After the wellbore center is calibrated, the wellhead site is excavated around the shaft to meet the needs of the wellbore construction.

[0036] The wellhead is 1.0m above the ground surface, and the vertical shaft is equipped with a C30 reinforced concrete structure well ring and lock ring within a range of 5m from the wellhead, and then the wellhead is backfilled with C15 rubble concrete.

[0037] After the wellhead site is leveled, mechanical equipment is used to excavate the surface soil section of the shaft wellhead. The excavation depth is 4m, and the excavation is divided into two layers. The excavation depth of each layer is 2m.

[0038]The wellhead section of the shaft is excavated and formed, and the lock ring is applied after cleaning the bottom. Erect the steel bars of the lock ring, and after the erection of the steel bars, support the inner and outer formwork of the lock ring, pour the conc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

A tunnel shaft construction method relates to a tunnel shaft construction method. The utility model is mainly designed to solve the problems of slow construction speed and the like in the existing tunnel shaft construction method. Excavate the topsoil section of the wellhead of the shaft and make a locking ring. Backfill the well circle wall with concrete to the wellhead elevation. Construct the wellhead reinforcement section; excavate the well body by drilling and blasting method, and carry out primary support; after the wellbore excavation and primary support are completed, carry out secondary lining and wall seat construction. Drill the blast hole well, and then carry out blasting, rock grasping and lifting work. Finally, the primary support of the shaft is carried out, and the concrete is sprayed. After the shaft excavation and the initial support are completed, the secondary lining and wall seat construction are carried out. After the excavation of the shaft is completed, the sprayed concrete construction shall be carried out after the vertical drainage pipe is set up at the place where the water leaks on the surface of the surrounding rock of the shaft for centralized drainage. After spraying the concrete, lay a soft permeable pipe on the surface of the sprayed concrete to drain the water into the central drainage ditch of the main tunnel. The advantage is that the construction speed is fast.

Description

Technical field: [0001] The invention relates to a tunnel shaft construction method. Background technique: [0002] During the construction of the existing extra-long tunnel, in order to shorten the construction period, a shaft should be set in the middle section of the tunnel to increase the working surface. The existing tunnel shaft construction method has the problems of slow construction speed and too long single cycle time of each process. Generally, the cycle time of mechanical construction is between 19-22 hours, which affects the construction progress. In addition, the waterproof and drainage measures are poor, and the safety and quality in the later stage cannot be well guaranteed. According to incomplete statistics, 70% of every 100 shafts in the current shaft project are maintained in the later stage due to drainage leakage and frost heaving in alpine regions. However, the later maintenance is particularly difficult, which greatly increases the construction cost....

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21D1/08E21D5/11E21D5/12
CPCE21D1/08E21D5/11E21D5/12
Inventor 何斌王大为张海波黄鑫何庆姝
Owner CHINA RAILWAY 19TH BUREAU GRP SECOND ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products