Selection method for optimal path of black-start network reconstruction
An optimal path and network reconfiguration technology, applied in the direction of single-network parallel feeding arrangement, etc., can solve the problems of the black start process not being fast enough, not taking into account the limitation of unit start-up time, etc., and achieve the effect of reducing the black start time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] Such as figure 1 As shown, the method for selecting the optimal path for black-start network reconstruction described in the present invention, the specific steps are as follows:
[0023] Step 1: Taking the switch stations, network hub substations, and hydropower stations in various regions as nodes during the black start process, and taking the switching stations, network hub substations, and connecting lines between hydropower stations as sides, comprehensively consider important loads and branch roads during the black start process. Parameters, etc., assign a weight to each edge to form a start node vector S, an end node vector E, and an edge weight vector W.
[0024] Among them, start node vector S=[1 2 3 ... n-1]; end node vector E=[3 ... n]; edge weight vector W=[a b c d ...]. In the formula, n represents the total number of power grid switch stations, network hub substations and hydropower station nodes in each region; Weights, the weights assigned to key lines...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com