Greening tree transplanting structure and transplanting method
A technology for tree transplanting and tree body, which is applied to the greening tree transplanting structure and the field of transplanting, can solve the problems of reduced water absorption rate, reduced tree survival rate, water loss, etc., achieves easy and convenient transplanting, and prevents trees from rotting root, the effect of improving the survival rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] refer to figure 1 and figure 2 , is a green tree transplanting structure disclosed by the present invention, comprising a planting pit 2 set on the ground, and the circumferential side walls in the planting pit 2 are fixedly laid with a soil-fixing board 3, and the soil-fixing board 3 is close to the planting pit 2 The side walls in the middle are fixedly laid with a waterproof layer 31. In this embodiment, the soil-fixing board 3 is a microporous ceramic filter plate, and the waterproof layer 31 is a SBS waterproof membrane or neoprene. The planting pit 2 is filled with Sand and gravel layer 21, nutrient soil layer 22 and planting soil layer 23, the upper surface of planting soil layer 23 is flush with the ground, a tree body 1 with soil ball 11 is planted in the planting pit 2, and soil ball 11 is positioned at nutrient soil layer 22 Inside, a water supply mechanism 5 and a clamping mechanism 6 are provided above the planting soil layer 23; the water supply mechanis...
Embodiment 2
[0060] A kind of greening tree transplanting method, comprises the following steps:
[0061] S1, dig out the planting pit 2 on the ground, and pour the same volume of water into the planting pit 2;
[0062] S2. Lay the soil-fixing board 3 on the inner circumferential side wall of the planting pit 2, and fix multiple pressure plates 4 with bolts 41 above the soil-fixing plate 3, so that the multiple pressure plates 4 form a closed ring shape, and then insert the nails 42 through the pressure plate 4 nailed into the ground;
[0063] S3, laying a waterproof layer 31 on the inner wall of the soil-fixing board 3, and making the top of the waterproof layer 31 flush with the ground, and the bottom of the waterproof layer 31 is not higher than the top of the soil ball 11;
[0064] S4. Backfilling the planting pit 2 with sand and gravel and compacting it to form a sand and gravel layer 21;
[0065] S5, put the tree body 1 with the soil ball 11 into the planting pit 2, make the bottom...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap