A Construction Method of Bored Pile in Complicated Inclined Rock and Boulder Geology

A technology for bored piles and construction methods, which are applied in drilling equipment and methods, excavation, geotextiles, etc., can solve the problems of waste of concrete, deflection of boreholes, unfavorable stress on pile foundations, and achieve good uniform stress. , Improve the verticality and prevent the ejection and deflection of the drill bit

Active Publication Date: 2021-07-27
ZHEJIANG UNIV CITY COLLEGE
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] When constructing bored piles in areas containing granite in the stratum, boulders (spherical irregular weathering of granite) are often encountered, which makes it difficult to form holes for bored piles
Due to the high strength of the granite boulder, the bored pile cannot be constructed to the design height; when the drill bit of the bored pile encounters inclined rock, due to the deflection of the rock surface, the impact drill bit is easily deflected by ejection, resulting in Deviation, the existing technical scheme for rectifying the deflection is: throwing and filling high-strength flakes, and then using a percussion drill to impact and rectify the deflection; after measuring the inclination of the drilled hole cannot meet the requirements, then throwing and filling high-strength flakes, and repeatedly impacting with a percussion drill Correction
In addition, boulder holes will be generated when the boulders on the side of the pile are removed, and concrete will be filled into the holes when the bored piles are poured, resulting in excessive filling, which wastes concrete and is unfavorable to the force of the pile foundation

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Construction Method of Bored Pile in Complicated Inclined Rock and Boulder Geology
  • A Construction Method of Bored Pile in Complicated Inclined Rock and Boulder Geology
  • A Construction Method of Bored Pile in Complicated Inclined Rock and Boulder Geology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0035] The present invention will be further described below in conjunction with the examples. The description of the following examples is provided only to aid the understanding of the present invention. It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, some improvements and modifications can be made to the present invention, and these improvements and modifications also fall within the protection scope of the claims of the present invention.

[0036] As an embodiment, the present application provides a construction method for complex inclined rock and boulder geological bored piles, including the following steps:

[0037] S1. Use a coring machine to drill the boulder 103 and set a borehole 102, wherein the borehole 102 is arranged 30-50 cm away from the edge of the pile hole 101, and the distance from each borehole 102 to the center of the pile hole 101 is equal; The distance between 102 is 20-30cm, an...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The present invention relates to a construction method for geological bored piles in complex inclined rocks and boulders, comprising steps: S1, using a coring machine to drill and drill holes on the foundation and boulders on the side of the pile; S2, making explosive tubes; S3, Every other drill hole is buried in drill hole 1; S4, install the lifting rope on the top of the limit rod; S5, put the steel sheath on the outside of the limit rod to the highest point of the rock surface; S6, pre-crack with static breaking agent and loose rocks; S7, lifting the lifting rope to recover the limit rod and PVC pipe for secondary use; S8, setting up geotextile bags on the part of the steel cage corresponding to the hole of the boulder; Expansion rubber; S10, sink the assembled steel cage to the designated position, and pour concrete. The beneficial effects of the present invention are: the present invention can prevent the deflection of the casing by setting the limit rod on the partial rock and boulder, and when the ejection deflection of the drill bit affects the casing, it can be restricted by the limit rod, thereby improving the verticality of the pile hole .

Description

technical field [0001] The invention relates to the construction of bored cast-in-place piles, in particular to a construction method of bored cast-in-place piles in complicated inclined rock and boulder geological conditions. Background technique [0002] When bored piles are constructed in areas containing granite in the stratum, boulders (spherical irregular weathering of granite) are often encountered, which makes it difficult to form holes for bored piles. Due to the high strength of the granite boulder, the bored pile cannot be constructed to the design height; when the drill bit of the bored pile encounters inclined rock, due to the deflection of the rock surface, the impact drill bit is easily deflected by ejection, resulting in Deviation, the existing technical scheme for rectifying the deflection is: throwing and filling high-strength flakes, and then using a percussion drill to impact and rectify the deflection; after measuring the inclination of the drilled hole ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21B7/00E21B25/00E02D5/38E02D17/08
CPCE02D5/38E02D17/08E02D2300/0006E02D2300/002E02D2300/0029E02D2300/0085E21B7/007E21B25/00
Inventor 王新泉崔允亮刁红国
Owner ZHEJIANG UNIV CITY COLLEGE
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products