A block and horizontal technology, applied in the direction of protection devices, buildings, infrastructure engineering, etc., can solve the problems of increased engineering volume and disposal difficulty, thick covering layer, large amount of materials, etc., to prevent and control environmental impacts and risks, Low-cost, abundant source effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0031] An electroplating factory was closed and relocated. After investigation, the heavy metal cadmium in the soil of the leftover land exceeded the relevant national standards, and the pollution depth was 0-5m, mainly in miscellaneous fill soil layers. The groundwater was buried at a depth of 10-12m, and the groundwater was not polluted. If the risk assessment confirms that the pollution hazard exceeds the acceptable risk level for human health or the ecological environment, it is a polluted plot. Since there are no governance and repair conditions at this stage, risk management and control are required, and the following methods are now used:
[0032] (1) Clean up the plot and remove plants, level the surface to form a slope with a slope of 1% to 3%, and pre-dug the foundation groove of the rainwater drainage system;
[0033] (2) Lay a kraft paper lining on the ground first, and then use automatic spraying equipment to spray a 10mm hybrid fiber concrete covering on the surf...
Embodiment 2
[0043] A short-term warehousing company was closed and relocated. After investigation, the persistent organic pollutants in the soil of the leftover land exceeded the relevant national standards, and the pollution depth was 0-10m, mainly in miscellaneous fill soil layers. The buried depth of groundwater exceeded 15m, and the groundwater was not polluted. If the risk assessment confirms that the pollution hazard exceeds the acceptable risk level for human health or the ecological environment, it is a polluted plot. Since the conditions for governance and repair are not available at this stage, risk management and control are required, and the following methods are now used:
[0044] (1) Clean up the plot and remove plants, level the surface to form a slope with a slope of 3% to 5%, and pre-dug the foundation groove of the rainwater drainage system;
[0045] (2) Lay the anti-oxidation nylon mesh lining on the ground first, and then use automatic spraying equipment to spray a 6mm...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Thickness | aaaaa | aaaaa |
| Length | aaaaa | aaaaa |
| Length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More