This invention belongs to the field of
saline-alkali
land improvement technology, and discloses a
system and method for constructing a physical
isolation layer and in-situ regenerating a arable layer in
saline-alkali land. The
system integrates eight units and pioneers a "non-excavation in-situ membrane laying + simultaneous
pipe laying" process to achieve a fully integrated process of "physical isolation + permeable drainage + soil improvement + field division + water and
fertilizer maintenance". A closed-loop
isolation system is constructed using isolation field ridges containing 15-20% quicklime and 0.6-1.5mm (lifespan over 50 years) HDPE membranes. This is combined with permeable blind pipes and a field
ridge drainage
system, along with drip / micro-
irrigation technology and fish
protein compound
enzyme fertilizer with a molecular weight ≤500Da, forming a
closed loop of "treatment-maintenance-yield increase". It overcomes the pain points of traditional technologies, shortens the treatment cycle by more than 80%, increases
crop yield by 30-50%, saves more than 60% of water, and improves soil microbial activity by more than 25%. After improvement, the
soil salinity is ≤0.1% and the pH value is 6.5-7.5. It has high
desalination efficiency and stable effect, and is suitable for the improvement and cultivation of various types of
saline-alkali land and heavy
metal contaminated land.