Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Material preparation completion management system and method for PC component steel reinforcement framework combined production

A steel skeleton and management system technology, applied in manufacturing computing systems, logistics, data processing applications, etc., can solve problems such as untimely material delivery, error-prone material processing, untimely logistics connection, etc., to achieve easy distinction, logistics status information Clear and time-effective effects

Pending Publication Date: 2020-10-27
筑友智造智能科技有限公司
View PDF3 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The object of the present invention is to provide a complete set of material management system for the combined production of PC component steel frame to solve the problem of untimely material transfer between the production processes of PC component steel frame, low logistics efficiency, untimely logistics connection between various processes, and material processing problems. Error-prone and other technical problems, further improve the logistics efficiency and production efficiency of PC component steel skeleton combination production, reduce the work intensity of operators, and improve production efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Material preparation completion management system and method for PC component steel reinforcement framework combined production
  • Material preparation completion management system and method for PC component steel reinforcement framework combined production

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The structural block diagram of the complete set management system of materials produced by the combination of PC component reinforcement skeleton provided by the present invention is as attached figure 1 shown, including:

[0027] The complete material management system for the production of PC components and reinforced skeletons, including:

[0028] A complete set of management device 100, used to obtain the composition information of the steel frame of the PC component, the information of the production station, and the logistics information of the parts and components, and generate the information on the arrangement of the waybill for the parts and components produced by the combination of the steel frame of the PC component;

[0029] The logistics device 200 is used to transport the parts and components produced by the combined production of PC components and steel bars according to the waybill arrangement information sent by the complete set management device 100;...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a material preparation completion management system for PC component steel reinforcement framework combined production. The system comprises a material preparation completion management device which is used for obtaining the composition information and production station information of a PC component steel reinforcement framework and the logistics information of parts and assemblies, and generating the waybill arrangement information of the parts and assemblies, a logistics device used for conveying parts and components according to the waybill arrangement information sent by the material preparation completion device, and a logistics management device used for guiding the logistics device to carry out logistics transportation according to the waybill arrangement information. The invention further provides a method adopting the material material preparation completion management system for PC component steel reinforcement framework combined production. Accordingto the material preparation completion management system, parts and assemblies can be transferred in time, accumulation is avoided, timeliness is high, and materials are easy to distinguish; the logistics state information of the materials is clear, the materials are easy to distinguish, wrong material use, repeated material processing or missing material processing are avoided, and the material transfer efficiency is high.

Description

technical field [0001] The invention belongs to the technical field of prefabricated buildings, and in particular relates to a complete material management system for the combined production of PC components and steel bars. Background technique [0002] At present, in the combined production of PC components and reinforced skeletons, the material transfer between the various production processes of the reinforced skeletons is basically carried out manually, and it is mainly carried by manual tools such as trolleys and forklifts according to the production procedures. This has the following technical problems: in the production process of the steel skeleton, if the materials in each process are not delivered in time, it will cause material accumulation in some processes, and the lack of materials in some processes can only waste time waiting. The efficiency and effect of material transfer are not good. In addition, for the production of different types of steel skeletons, the...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/08G06Q50/04
CPCG06Q10/06316G06Q10/083G06Q50/04Y02P90/30
Inventor 唐柏意黄岸陈明鲁照明赵辉良蒋先长
Owner 筑友智造智能科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products