Building indoor grooving, wire embedding and repairing integrated equipment
A construction room and equipment technology, which is applied in the direction of construction, building structure, cable laying equipment, etc., can solve the problems of affecting the wiring effect, high labor intensity, and low efficiency, so as to reduce the labor intensity, improve work efficiency, reduce The effect of the construction process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The following description serves to disclose the present invention to enable those skilled in the art to carry out the present invention. The preferred embodiments described below are only examples, and those skilled in the art can devise other obvious variations.
[0032] refer to Figure 1-Figure 4The shown integrated equipment for slotting and embedding repair in a building includes a tracking trolley 1, a slotting component 2, a dust collection component 3, a thread embedding component 4, a groove repairing component 5 and a smoothing component 6. Groove assembly 2, dust collection assembly 3, thread embedding assembly 4, groove repair assembly 5 and smoothing assembly 6 are sequentially installed on the tracking trolley 1, and the tracking trolley 1 includes an organism 7, a chassis 8 and a groove depth adjustment mechanism, The slotting depth adjustment mechanism is vertically fixedly installed on the body 7, the output end of the slotting depth adjustment mechan...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


