Prefabricated tubular pile implanting device and pile implanting construction method
A technology for prefabricated pipe piles and implantation devices, applied in the directions of support devices, drilling equipment and methods, drilling pipes, etc., can solve the problems of collision between auger rods and prefabricated piles, difficulty in lengthening operations, and great potential safety hazards. The effect of extension construction is convenient, efficient and safe, and the effect of improving efficiency and safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0063] Such as figure 1 As shown, the prefabricated tubular pile implantation device of this embodiment includes a support base 14, a drilling tool assembly 2, a drilling rig main body 1 with a drill mast 3, a crane 12 located at the top of the drill mast 3, and a crane connected to the drill mast 3. The power head assembly on one side, the pile supporter 9 and the storage mechanism 13, the power head assembly and the pile supporter 9 are located on the same side of the drill mast 3, and the storage mechanism 13 and the power head assembly are located on different sides of the drill mast 3.
[0064] Wherein the drilling rig main body 1 is a crawler pile frame type walking device, the drilling mast 3 is connected with the front end of the drilling rig main body 1 through a pin shaft and a strut, and the pile supporter 9 is fixed on the middle and lower parts of the drilling mast 3 by bolts.
[0065] The storage mechanism 13 is used for storing the drilling tool assembly 2 and ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


