Water-rich sand layer large-diameter pipe jacking group in-out hole reinforcing structure and construction method

A water-rich sand layer and reinforcement structure technology, applied in earthwork drilling, wellbore lining, tunnel lining, etc., can solve the problems of high construction cost, difficult construction, and difficulty in pile formation by freezing method, and achieve the goal of construction difficulty and construction cost The effect of reducing and improving reinforcement efficiency and improving quality

Active Publication Date: 2021-01-22
CHINA TIESIJU CIVIL ENG GRP CO LTD +1
View PDF9 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

When the geological conditions are complex, conventional mixing pile reinforcement technology is difficult to form piles under complex geological conditions; the construction cost of freezing method is too high, the construction is difficult and the construction period is long

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Water-rich sand layer large-diameter pipe jacking group in-out hole reinforcing structure and construction method
  • Water-rich sand layer large-diameter pipe jacking group in-out hole reinforcing structure and construction method
  • Water-rich sand layer large-diameter pipe jacking group in-out hole reinforcing structure and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0031] The reinforcement structure of the large-diameter pipe jacking group access hole in the water-rich sand layer of the present invention includes an underground diaphragm wall and a high-pressure jet grouting pile. The thickness of the wall is 0.8m, and the depth of the underground diaphragm wall is 10m below the elevation of the bottom of the pipe jacking machine, so as to effectively form a water-stop curtain. The relative underground diaphragm wall is supported by cross braces.

[0032] Preferably, a row of two C30 cast-in-place bored piles with a diameter of 0.6m are arranged in the middle of the originating well and the receiving well, and the bored cast-in-place piles are at the same depth as the underground diaphragm wall, both The bottom elevation of the pipe jacking machine is 10m below, and the cross brace is fixedly connected to the bored pile, so that the cross brace in the support well is reinforced by the bored pile.

[0033] The high-pressure rotary groutin...

Embodiment 2

[0037] Such as figure 1 as shown, figure 1 It is a structural view of the reinforcement structure of the large-diameter pipe jacking group in the water-rich sand layer; this embodiment is explained through actual cases;

[0038] Three pipe jacking machines are assembled in the originating shaft 9, respectively jacking from left to right by the first entrance 6, the second entrance 7, and the third entrance 8, and then by the first exit 61, the second The exit hole 71 and the third exit hole 81 reach the receiving well.

[0039] When the pipe jacking machine group takes out the starting shaft 9, it is called exiting the hole, and when the pipe jacking machine group enters the receiving shaft 10, it is called entering the hole, thus completing a cycle.

[0040] Such as figure 2 as shown, figure 2 It is a structural view of the originating shaft; the reinforced structure of the water-rich sand layer large-diameter pipe jacking group entry and exit holes of the present inven...

Embodiment 3

[0051] Such as Figure 4 as shown, Figure 4 It is the reinforcement structure diagram of the pipe jacking entrance and exit hole, the opening 12 is provided with a water stop ring, and the opening 12 is the opening of the entrance and exit hole of the pipe jacking group, and the water stop ring is embedded in the lining structure 13 and the surrounding A protective structure 14, the enclosure structure 14 is an underground diaphragm wall, and the inner lining structure 13 is a concrete reinforcement structure extending from the underground diaphragm wall to the working well. The reinforced soil 17 in the figure can be the high-pressure jet grouting pile 5 .

[0052] The water stop ring includes a pre-embedded steel ring 15, a pressure plate 19, a rubber ring 20 and an installation steel ring 18, and the pressure plate 19 and the rubber ring 20 are arranged between the embedded steel ring 15 and the installation steel ring 18 Between, when setting up the enclosure structure ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a water-rich sand layer large-diameter pipe jacking group in-out hole reinforcing structure and a construction method. The water-rich sand layer large-diameter pipe jacking group in-out hole reinforcing structure comprises underground diaphragm walls and high-pressure jet grouting piles, the underground diaphragm walls are arranged at the edge positions of a starting well and a receiving well, and the depth of the underground diaphragm walls is below the bottom elevation of a pipe jacking machine; cast-in-situ bored piles are arranged in the middles of the inner sides of the starting well and the receiving well, the cast-in-situ bored piles and the underground diaphragm walls are the same in depth, the underground diaphragm walls are supported through transverse supports, and the transverse supports are fixedly connected with the cast-in-situ bored piles; and the high-pressure jet grouting piles are arranged on the outer side of a jacking pipe group in-out holeand the outer sides of the underground diaphragm walls, are arranged to be of a plum blossom type meshed row-shaped structure and are arranged in parallel with the underground diaphragm walls. According to the water-rich sand layer large-diameter pipe jacking group in-out hole reinforcing structure and the construction method, the large-diameter jacking pipe group in-out hole is reinforced, the reinforcing efficiency of the in-out hole is improved, the machining process steps are simplified, the stratum reinforcing quality is greatly improved, the construction difficulty and the construction cost are reduced, and the construction period, the quality and the economical efficiency of engineering are guaranteed.

Description

technical field [0001] The invention relates to the technical field of multi-row pipe jacking construction, in particular to a reinforcement structure and a construction method for the entry and exit holes of large-diameter pipe jacking groups in water-rich sand layers. Background technique [0002] With the continuous progress of urbanization, the application of pipe jacking construction in the urban pipe network is becoming more and more extensive and systematic. For water-rich sand layer areas, large-diameter pipe jacking groups often have engineering quality problems during the process of pipe jacking in and out of the hole. defects etc. As a mechanically unstable stratum, the water-rich sand stratum has high fluidity and is likely to cause large-scale stratum disturbance. During construction, the surface settlement is not easy to control. When the large-diameter pipe jacking group enters and exits the hole, the construction risk is relatively high. key process. Theref...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/14E21D11/00E21D11/10E21D11/38
CPCE21D9/14E21D11/00E21D11/10E21D11/38Y02E10/20
Inventor 杨俊峰余世祥曹广勇袁正璞林键杨祖兵詹杰沃云舟王伟超邓文杰张挺
Owner CHINA TIESIJU CIVIL ENG GRP CO LTD