Prefabricated hollow concrete-filled steel tube supporting member, inner supporting system and construction method
A technology of hollow steel pipes and supporting components, which can be used in basic structure engineering, excavation, building construction, etc. It can solve the problems of non-compliance, labor and material resources, and poor deformation resistance, so as to ensure integrity and safety, and facilitate transportation and installation, the effect of strong deformation resistance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0065] Such as Figure 3-Figure 6 As shown, this embodiment provides a prefabricated hollow concrete-filled steel tube support member 3, including a steel tube 11 and a steel structure at the end; both ends of the steel tube 11 are welded with a steel structure at the end; the steel tube 11 is poured with filled concrete 16. The filled concrete 16 has a hollow part penetrating along the supporting direction; the filled concrete 16 is equipped with a steel skeleton and a plurality of corrugated pipes 36, and the two ends of the steel skeleton are respectively connected to the steel structures at both ends; Each of the bellows 36 is stretched with prestressed longitudinal ribs 13 and filled with cement slurry. Both ends of the prestressed longitudinal ribs 13 protrude from the bellows 36 and are respectively anchored in the steel structure at both ends. . The prefabricated hollow concrete-filled steel pipe support member 3 of this embodiment is a hollow member filled with concr...
Embodiment 2
[0073] Such as figure 1 and figure 2 As shown, the present embodiment provides an internal support system, including an enclosure structure 1, a crown beam 2, a waist beam, and an assembled inner support; the top of the enclosure structure 1 is provided with a crown beam 2, and the enclosure structure 1 is provided with a waist beam, and the assembled inner support is supported between the opposite sides of the waist beam and the opposite sides of the crown beam 2; the assembled inner support is composed of a plurality of the above-mentioned The prefabricated hollow concrete-filled steel tube support members 3 are spliced together; the crown beam 2 or the waist beam are pre-embedded with embedded parts 4, and the two ends of the prefabricated inner support are connected with the embedded parts 4 on both sides respectively. connect. The hollow parts of the multiple prefabricated hollow concrete-filled steel tube support members 3 of the prefabricated inner support of this ...
Embodiment 3
[0085] This embodiment provides a construction method for the prefabricated hollow concrete-filled steel tube support member 3 provided in Embodiment 1, which includes the following steps:
[0086] S1. In the steel structure processing plant, the end steel structure and the steel pipe 11 are integrally processed to form a prefabricated composite steel member, such as image 3 shown;
[0087] S2. Transport the prefabricated composite steel member to the prefabricated pipe pile production factory, bind the ordinary longitudinal bars 14 and stirrups 12 to form a steel skeleton, then put the prefabricated composite steel member and the steel skeleton into a prefabricated pipe pile mold as a whole, and then place it on the steel pipe Fix the corrugated pipe 36 at the corresponding position in 11, reserve the grouting pipe and the grouting pipe, then pour the filling concrete 16 in the steel pipe 11 and reserve the hollow part;
[0088] S3. When the concrete reaches the design stre...