Servo type composite earth pressure balance miniature shield device and working method
An earth pressure balance and working method technology, applied in teaching models, instruments, educational appliances, etc., can solve the problems of high cost of shield machine, difficult to widely implement, high technical risk, reduce front and rear push and up and down resistance, The effect of avoiding end subsidence and improving overall stiffness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036]In a typical implementation of the present disclosure, such asFigure 1-Figure 2As shown, a servo-type composite earth pressure balance micro shield device is proposed.
[0037]The shield device mainly realizes the simulation of the excavation process through the rotation of the cutter head and the overall mechanical advancement of the shield machine, and the rock and soil dug into the earth pressure balance chamber are transported out of the shield model by the auger excavator. This is to simulate the process of muck transportation when the shield is advancing.
[0038]The shield tunneling test machine is mainly composed of cutter head 1, cutter, rotating power system, earth pressure balance chamber 2, shield shell, jacking structure, twisted dragon excavator, traveling power system, height lifting control system, shield tunneling multi-parameter Control platform and other subsidiary structures;
[0039]By obtaining the soil pressure in the front face of the cutter head, the rotation s...
Embodiment 2
[0056]In another exemplary embodiment of the present disclosure, such asFigure 1-Figure 2As shown, a working method of the servo-type composite earth pressure balance micro shield device as in Example 1 is given.
[0057]It includes the following steps:
[0058]Arrange the testing machine according to the relative position of the excavation model, and arrange the corresponding lifting mechanism under the testing machine;
[0059]After adjusting the relative position of the testing machine and the excavation model to the required requirements, the testing machine excavates the excavation model according to the preset tunneling parameters;
[0060]Adjust the speed of the cutter head and the slag discharge speed of the earth pressure balance chamber through the parameter control platform, change the pressure of the soil in front of the cutter head to adapt to different geological conditions, and maintain the soil in front of the cutter head and the soil pressure balance chamber of the testing mach...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

