Method for evaluating wind speed time shifting
A time-shifting and wind speed technology, applied in the field of wind farms, can solve problems that are difficult to apply, have not yet been quantified, and cannot be optimized by the model
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0069] The method for evaluating the time-shift of wind speed between remote wind power bases (when there is no influence of speed factor SF) includes the following steps:
[0070] Step 1: Data extraction and preprocessing; time series data of wind speed and wind direction at 5 spatial locations were collected respectively, the data time range was from January 1, 2004 to October 31, 2018, and the time resolution was 1h; for the above The data is cleaned and preprocessed, including inspection and screening, error data elimination, and reasonable interpolation and correction. figure 2 It is the relative position distribution diagram of each space point in embodiment 1;
[0071] Step 2: Determine the time window; set the time window to 1 day, that is, analyze and evaluate the time-shift of wind speed under the time window of 1 day (24h);
[0072] Step 3: Obtain the wind process set at the starting point 1#; divide the wind speed sequence and wind direction sequence at the start...
Embodiment 2
[0103] The method for evaluating the time shift of wind speed in a wind farm includes the following steps:
[0104] Step 1: Data extraction and preprocessing; collect the time series data of wind speed and wind direction at four spatial locations respectively, the data time range is from January 1, 2014 to December 31, 2014, and the time resolution is 1min; for the above The data is cleaned and preprocessed, including inspection and screening, error data elimination, and reasonable interpolation and correction. Figure 10 It is the relative position distribution diagram of each space point in embodiment 2.
[0105] Step 2: Determine the time window; set the time window to 1h, that is, analyze and evaluate the time shift of wind speed under the time window of 1h (60min);
[0106] Step 3: Obtain the wind process set at the starting point 1#; divide the wind speed sequence and wind direction sequence at the starting point 1# at the same time according to the 1h time window, and ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com