Raise boring method construction method for 200-600m ventilation shaft of highway extra-long tunnel
A technology for ventilation shafts and construction methods, which is applied in shaft equipment, sinking, earthwork drilling, etc., and can solve problems such as low construction efficiency and poor safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0095] The technical solutions of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Apparently, the described embodiments are some of the embodiments of the present invention, but not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0096] This embodiment takes the ventilation shaft of a highway tunnel as an example to describe in detail the specific process of the construction method of the 200-600 m ventilation shaft of a super-long highway tunnel. The ventilation mode of the tunnel on the right line of the expressway adopts longitudinal jet flow + vertical shaft conveying and exhausting segmented longitudinal ventilation, the tunnel on the left line adopts longitudinal jet flow fan for ventilation, and the vertical shaft is used for cen...