A method and device for predicting the construction period of a power transmission and transformation project
A prediction method and power transmission and transformation technology, applied in the field of power transmission and transformation engineering, can solve the problems of insufficient application level of historical data of power transmission and transformation project progress and insufficient progress control informatization level, so as to avoid subjectivity, reduce labor costs, and improve efficiency effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] The preferred embodiments of the present invention are specifically described below with reference to the accompanying drawings, wherein the accompanying drawings constitute a part of the present application, and together with the embodiments of the present invention, are used to explain the principles of the present invention, but are not used to limit the scope of the present invention.
[0039] A specific embodiment of the present invention discloses a construction period prediction method for a power transmission and transformation project. like figure 1 As shown, the method for predicting the construction period of a power transmission and transformation project includes step S102, collecting raw data of a plurality of historical power transmission and transformation projects and preprocessing the raw data, wherein the raw data includes construction scale parameters and basic characteristic parameters; step S104 , Based on the original data and the construction per...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


