A method and device for predicting the construction period of a power transmission and transformation project

A prediction method and power transmission and transformation technology, applied in the field of power transmission and transformation engineering, can solve the problems of insufficient application level of historical data of power transmission and transformation project progress and insufficient progress control informatization level, so as to avoid subjectivity, reduce labor costs, and improve efficiency effect

Active Publication Date: 2022-06-17
STATE GRID FUJIAN ELECTRIC POWER CO LTD +4
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In view of the above analysis, the embodiment of the present invention aims to provide a construction period prediction method and device for power transmission and transformation projects, so as to solve the problem that the existing power transmission and transformation projects have insufficient application level of progress historical data and insufficient progress control information level

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A method and device for predicting the construction period of a power transmission and transformation project
  • A method and device for predicting the construction period of a power transmission and transformation project
  • A method and device for predicting the construction period of a power transmission and transformation project

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0038] The preferred embodiments of the present invention are specifically described below with reference to the accompanying drawings, wherein the accompanying drawings constitute a part of the present application, and together with the embodiments of the present invention, are used to explain the principles of the present invention, but are not used to limit the scope of the present invention.

[0039] A specific embodiment of the present invention discloses a construction period prediction method for a power transmission and transformation project. like figure 1 As shown, the method for predicting the construction period of a power transmission and transformation project includes step S102, collecting raw data of a plurality of historical power transmission and transformation projects and preprocessing the raw data, wherein the raw data includes construction scale parameters and basic characteristic parameters; step S104 , Based on the original data and the construction per...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a construction period prediction method and device for a power transmission and transformation project, which belongs to the technical field of power transmission and transformation projects, and solves the problems that the existing power transmission and transformation projects have insufficient progress historical data application level and insufficient progress control information level. The method includes: collecting raw data of multiple historical power transmission and transformation projects and preprocessing the raw data, wherein the raw data includes construction scale parameters and basic characteristic parameters; using multivariate statistics based on the raw data and the construction period corresponding to the raw data Regression method for analysis and calculation and use of principal component analysis and principal factor analysis methods to reduce the amount of original data and obtain historical progress data of multiple historical power transmission and transformation projects; and use the original data and the construction period corresponding to the original data to obtain A neural network prediction model, and obtain the predicted construction period of the power transmission and transformation project to be predicted through the neural network prediction model. It can predict the construction period of power transmission and transformation projects.

Description

technical field [0001] The invention relates to the technical field of power transmission and transformation projects, in particular to a construction period prediction method and device for a power transmission and transformation project. Background technique [0002] As a core business of the company, power grid construction is an important foundation for realizing the development goals of the power grid company. Therefore, strengthening investment in power infrastructure and accelerating transformation and development have put forward higher requirements for infrastructure control. [0003] The existing power transmission and transformation projects have the practical problems of insufficient application level of progress historical data and progress control informatization. In the process of preparing, real-time tracking and progress evaluation of the power transmission and transformation project schedule, the expert experience of the schedule controller is generally us...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06Q10/04G06Q10/10G06Q50/06G06Q50/08G06F17/11G06N3/04G06N3/08
CPCG06Q10/04G06Q10/103G06Q50/06G06Q50/08G06F17/11G06N3/04G06N3/08Y04S10/50
Inventor 刘沁尹琛陈秉乾吴申平郭志彬林海强魏文新张成炜
Owner STATE GRID FUJIAN ELECTRIC POWER CO LTD