Electric power system cascading failure blocking method based on active minimum generator tripping
A technology of cascading faults and power systems, applied in the direction of power network operating system integration, information technology support systems, electrical components, etc., to achieve the effect of ensuring safe recovery
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0082] The present invention will be further described in detail below in conjunction with the accompanying drawings.
[0083] like figure 1As shown, the present invention discloses a method for blocking cascading faults in a power system based on active minimum cut-off, comprising the following steps:
[0084] S101. When the transmission line is overloaded, the synchronous generator node with the first power sensitivity ranking is used as the cut-off node, the load node with the first power sensitivity ranking is used as the load-cutting node, and the power sensitivity ranking is the kth power supply node. Balance nodes, calculate the minimum amount of power cut required to ensure the safe recovery of overloaded transmission lines; power sensitivity is sorted in descending order;
[0085] S102. Check whether the minimum cut-off amount satisfies the power supply capacity constraint, the load capacity constraint and the balance node power adjustment speed constraint; if so, re...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com