A solar cell and installation method technology, which is applied to solar thermal power generation, solar thermal energy, solar thermal collectors, etc., can solve the problems of poor power transmission stability, large investment, and impact on the daily life of residents, so as to prevent users from power outages. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] A. On-site survey: survey and classify multiple types of loads in the installation area, confirm the important load power and uninterrupted power time, calculate the required battery capacity, and confirm the module specifications and quantities according to the roof conditions and lighting conditions in the installation area;
[0033] B. Material selection: select according to the survey area (4KW photovoltaic modules are used in this document), including the following components: bracket profiles, lead-acid batteries, photovoltaic panel components, inverter components and distribution box components;
[0034] C. Component installation: first install the bracket profile in the installation area, then install the photovoltaic panel components on the bracket profile through bolts and other components, and then install the lead-acid battery, inverter component and distribution box component on the wall respectively , and finally connect the photovoltaic panel components, l...
Embodiment 2
[0037] In embodiment one, add following operation:
[0038] The parameter of the acid lead battery in the material selection step is 2V, 200Ah, and the quantity is 24 pieces, and the parameter of the photovoltaic panel assembly in the material selection step is 275Wp, and the quantity is 16 pieces.
[0039] A. On-site survey: survey and classify multiple types of loads in the installation area, confirm the important load power and uninterrupted power time, calculate the required battery capacity, and confirm the module specifications and quantities according to the roof conditions and lighting conditions in the installation area;
[0040] B. Material selection: select according to the survey area (4KW photovoltaic modules are used in this document), including the following components: bracket profiles, lead-acid batteries, photovoltaic panel components, inverter components and distribution box components;
[0041]C. Component installation: first install the bracket profile in ...
Embodiment 3
[0044] In embodiment two, add following operation:
[0045] In the component installation step, the bracket profiles include long metal columns, short metal columns, diagonal braces, horizontal plates and vertical plates. The length of the long metal columns is 2.25 meters, the length of the short metal columns is 0.4 meters, and the length of the diagonal braces is 2 meters. The length of the horizontal board is 6 meters, and the length of the vertical board is 4 meters.
[0046] A. On-site survey: survey and classify multiple types of loads in the installation area, confirm the important load power and uninterrupted power time, calculate the required battery capacity, and confirm the module specifications and quantities according to the roof conditions and lighting conditions in the installation area;
[0047] B. Material selection: select according to the survey area (4KW photovoltaic modules are used in this document), including the following components: bracket profiles, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com