Unlock instant, AI-driven research and patent intelligence for your innovation.

Construction method for split translation of complex steel sleeve and shield tunneling machine

A construction method and technology of steel sleeves, which are applied in earth-moving drilling, mining equipment, tunnels, etc., can solve the problems of split translation between complex steel sleeves and shield machines, and achieve fast construction speed, flexible starting position, The effect of excavation safety

Active Publication Date: 2021-08-20
THE FOURTH ENG CO LTD OF CHINA RAILWAYNO 20 BUREAU GRP +3
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The object of the present invention is to provide a construction method in which the complex steel sleeve and the shield machine are separated and translated in accordance with the above-mentioned deficiencies in the prior art. The machine is hoisted separately into the hoisting shaft, and the separate parts are moved in translation, which solves the problem of starting the translation and assembly of the shield machine

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for split translation of complex steel sleeve and shield tunneling machine
  • Construction method for split translation of complex steel sleeve and shield tunneling machine
  • Construction method for split translation of complex steel sleeve and shield tunneling machine

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0035] Example: such as Figure 1-11 As shown, this embodiment relates to a construction method in which the complex steel sleeve and the shield machine are separated and translated, and the steps of the construction method are:

[0036] a. If figure 1 and figure 2 As shown, a horse bench 3 is set up in the hoisting shaft 1, and steel plates are laid towards the station 2. The hoisting shaft 1 communicates with the closed starting shaft 6 through the transportation channel. There are 4 columns 5 and 4 columns 5 in the transportation channel. Arranged in a square shape, the track 4 is laid in the transportation channel, and the track 4 extends to the hoisting shaft 1 and the originating shaft 6. The track 4 includes the trolley walking track, the trolley walking track and the active transport track, and the active transport track is set on the column 5 During the period, the trolley, the trolley and the shield can move through the trolley walking track, the trolley walking t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for split translation of a complex steel sleeve and a shield tunneling machine. The construction method comprises the following steps: a horse stool is erected in a hoisting well, a steel plate is paved towards a station, the hoisting well communicates with a closed starting well through a conveying channel, a plate trailer walking track and a trolley walking track are paved in the conveying channel, a plurality of stand columns are arranged in the conveying channel, and movable conveying tracks are arranged among the stand columns; a trolley, a plate trailer, a screw conveyor and a connecting bridge are hoisted into the hoisting well, the screw conveyor and the connecting bridge are installed on the plate trailer, the trolley, the screw conveyor and the connecting bridge are moved to the starting well through the plate trailer walking track and the trolley walking track, and the trolley, the screw conveyor and the connecting bridge are pulled into the station; a translation platform is erected in the hoisting well, a shield tunneling machine head is divided into two sets of assemblies, namely the first set of assemblies and the second set of assemblies, and the two sets of assemblies are both placed on the translation platform; and the screw conveyor is hoisted, and after the screw conveyor is installed, the connecting bridge and the trolley are pulled to the shield tunneling machine head.

Description

technical field [0001] The invention relates to the technical field of tunnel excavation construction, in particular to a construction method in which a complex steel sleeve and a shield machine separate and translate. Background technique [0002] At present, in the construction of urban subway tunnels in my country, the shield method has become the preferred method for urban rail transit construction. At some transfer stations, since there is no shield hoisting port reserved, the shield machine can only be moved to the starting point of the shield tunnel on the other side of the station by means of translation. Due to the large size and mass of the shield machine, and the constraints of planning and construction (such as underground stations, the design space is often small or the structure is complex), especially the shield machine in the case of small space and no large-scale mechanical assistance The origin problem of machine translation assembly is quite difficult. T...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)