A prefabricated back cover and installation process of an offshore wind power implanted high pile cap
A technology for offshore wind power and high pile caps, which is applied in infrastructure engineering, construction, etc., can solve the problems of increasing the difficulty of construction technology, excessive verticality of the casing, and curling of the boulder casing, ensuring welding and concrete protection. The effect of pouring quality, overall structural stability, and optimized structural form
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The present invention will be further described below in conjunction with accompanying drawing.
[0040] see Figure 1a to Figure 6 , The prefabricated bottom cover and installation process of the offshore wind power implanted high pile cap of the present invention includes the following processes: onshore fabrication of the prefabricated bottom cover of the cap, offshore pile planting, installation of the prefabricated bottom cover of the cap, and the second phase construction of the cap;
[0041] The prefabricated back cover of the platform includes a concrete back cover 10, six pile piercing holes evenly distributed on the concrete back cover 10, and six one-to-one corresponding buried in multiple pile piercing holes and the height is the same as the thickness of the concrete back cover 10. The casing 20, the base ring 30 installed in the center of the top surface of the concrete back cover plate 10, six connecting webs 40 uniformly distributed in the circumferential...